Recent developments to monitor

📐 Article

By , construction economist

Information verified on 6 min read

What you will learn The common thread running through recent developments, the electrical reform in force since April 2026, the other changes of recent years, and how to organise monitoring without spending days on it.

Recent developments in Belgian building regulation are not scattered. They follow a single thread: the electrification of buildings and energy storage.

Understanding that thread allows anticipation rather than reaction. Recent developments follow a legible direction.

The electrical reform of 2026

This is the most significant development of the recent period. It concerns new or altered installations rather than existing stock.

A royal decree published in the Official Gazette in late October 2025 amended the first two books of the general regulation on electrical installations. Its provisions entered into force on 1 April 2026.

The principal object is the integration of direct current. The text adds earthing arrangements for direct current, previously absent from a scheme addressing alternating current only.

The rationale is explicit: the growing presence of direct current systems in low and extra-low voltage installations, notably storage batteries and photovoltaic panels.

Three practical consequences for design.

Protection must suit direct current. A residual current device designed for alternating current does not detect direct current faults in the same way, which calls for specific components.

Cables and equipment must be intended for that use, an arc in direct current behaving differently from one in alternating current.

Existing installations already compliant are not covered, the reform bearing on new installations.

A good illustration of the federal base

That reform illustrates precisely what this guide says about the division of competences. The federal level alone sets the rule, with no regional variant.

The electrical regulation is federal, meaning an installation meets the same requirements in all three regions. It is one of the few fields where such uniformity exists, as the article on federal competences explains.

It should not be confused with energy certification, which is regional and follows different logics by region.

The pace of electrical developments

A useful point for situating the period.

The current scheme rests on a 2019 overhaul, applicable from 1 June 2020, followed by successive adjustments: a first set in November 2022, a second in June 2023 on the types of residual current device permitted, provisions in March 2025 on bathrooms and socket outlets, the direct current reform in April 2026, then the end of the sealing of the main residual current device in dwellings in November 2026. The dates are checked before a version is invoked.

The pace is therefore brisk, with an amendment almost every year since 2022. It is the fastest-moving technical field in Belgian construction, and the one warranting the closest monitoring.

Batteries and the European framework

A second effect of the same dynamic.

Energy storage is subject to its own European framework, which produces effects on installations. It adds to national electrical requirements rather than replacing them.

For a project including storage, two bodies of rules therefore combine: the European framework on batteries and the national electrical regulation.

Installing a battery constitutes a significant modification of the electrical installation, with the corresponding inspection obligations, covered in the article on inspection bodies.

The effect on fire safety

The thread continues into fire standardisation. International reference frameworks are evolving too.

A new version of the international standard on fire classes was published in early 2026, adding a class dedicated to lithium battery fires. Its take-up in Belgian law follows its own calendar.

That is normative recognition of a new risk, whose effects will be felt progressively on firefighting means and on the requirements applying to storage rooms.

Other developments of recent years

Three changes deserve recalling, covered elsewhere in this guide. They concern fire, acoustics and civil law.

Fire safety. The last substantive amendment to the federal scheme dates from 2022, notably on façades, car parks, boiler rooms and lifts. Since then the administration has published interpretative notes, several in 2025 and 2026. This is covered in the article on basic fire safety standards.

Acoustics. The residential standard was revised in 2022, the revised version applying to permit applications submitted since 1 January 2023, with a move to three performance classes. See the article on acoustics between dwellings.

Civil law. The book of the Civil Code devoted to special contracts was published in September 2026 and will apply to contracts concluded from 1 September 2027. It rewrites ten-year liability in particular, which affects references and numbering on liability. See the article on good practice and liability.

Organising sustainable monitoring

Four principles, to avoid disproportionate effort. They organise useful rather than exhaustive monitoring.

Monitor by level, not by subject. Federal, regional and municipal sources publish separately, and searching by subject means cross-referencing constantly.

Focus on the fast-moving fields. The electrical regulation and regional energy requirements evolve markedly faster than structure or fire.

Note entry into force, not publication dates. A published text is not yet applicable, and transitional provisions determine what applies to a given project.

Check before pricing, not before designing. A check made too early will be obsolete by the time of commitment.

Points to recheck regularly

Field Recommended frequency
Electrical regulation on every project with storage or photovoltaics
Regional energy requirements quarterly
Sector fire rules quarterly
Basic fire safety standards each campaign
Acoustic and ventilation standardisation annually

This article reflects developments known at the date of checking and serves professional orientation. It does not constitute legal advice and does not replace consulting the applicable texts.

Frequently asked questions

They follow a common thread, the electrification of buildings and energy storage. That direction is legible and allows anticipation rather than reaction.

The electrical reform is federal, which illustrates exactly the division of competences set out in this guide. It applies on the same date in all three regions, unlike the energy requirements.

Yes, international standardisation follows its own calendar, and a new version of the standard on classes of fire was published in early 2026, adding a class for lithium battery fires. Its take-up in Belgian law follows a separate calendar.

By keeping to a few principles, which organise useful rather than exhaustive monitoring. Checking the version applicable at the permit date remains the most profitable reflex.