The parameters limiting volume

📐 Article

By , construction economist

Information verified on 5 min read

What you will learn The four ratios of the degree of land use, the gross and net distinction that distorts most calculations, the reference area, and the siting parameters.

Developable volume is never set by a single figure. It results from several parameters acting together, and the most restrictive prevails.

The degree of land use

The Luxembourg terminology is precise and set by regulation. Documents refer to the ratios by their French abbreviations.

Ratio What it relates
Land use ratio (CUS) total built area to plot area
Site coverage ratio (COS) ground footprint of buildings to plot area
Soil sealing ratio (CSS) sealed ground surface to plot area
Housing density (DL) number of dwelling units to plot area

These four parameters apply simultaneously. A project may meet the land use ratio and still be blocked by housing density, or by sealing.

The most restrictive determines the project, and it is not always the one looked at first.

The distinction that distorts most calculations

This is the main trap, and it does not show on a quick reading. The parameters combine rather than apply in isolation.

The ratios do not all relate to the same plot area.

Some are calculated on gross developable land, which includes in particular the areas intended for servicing.

Others are calculated on net developable land, from which those are deducted.

The gap between the two can be substantial, the share given over to servicing representing a significant fraction of land intended for urbanisation.

Consequence: applying a ratio to the wrong area produces an error of tens of per cent in the estimated development potential, always in the optimistic direction.

The rule is therefore to check, in the written part of the document consulted, which area each ratio relates to, before any calculation.

The reference area

The central quantity deserves particular attention, as its definition is not intuitive. It determines the developable area.

Gross built area adds the areas of all levels, measured externally, building and outbuildings included.

Certain areas are excluded, notably areas incapable of conversion in the basement or under the roof.

Unenclosed areas are also excluded, such as balconies, loggias and open car ports.

These exclusions are a design lever, since they allow certain spaces to be built without consuming development potential.

But they vary with the document consulted, which requires reading the applicable definitions rather than reasoning from habit.

The siting parameters

They bound volume differently, and are often more decisive than the ratios. They concern heights and setbacks.

Setbacks from plot boundaries and from the road, which define the available footprint.

Heights, expressed against reference points specified in the document, together with the number of levels permitted.

Alignments and building bands, which impose a position and not merely a distance.

Form and roof requirements, particularly in areas subject to an integration requirement.

On a narrow or constrained plot, setbacks determine the project, well before the ratios.

A modulation mechanism worth knowing

One scheme can alter the degree of land use. Its reach is checked in the written part.

The law provides a mechanism increasing the degree of land use in return for commitments on affordable housing, applying to certain urbanisation schemes.

It concerns mainly operations of a certain size rather than individual projects.

Its regime has been amended and is the subject of further proposals, which requires checking the law in force at the time of the project.

What this means for a professional

Four rules.

Check the reference area of each ratio before any calculation, the error being frequent and always favourable in appearance.

Calculate all four ratios, and take the most restrictive.

Check setbacks before ratios on narrow plots, where they decide the project.

Read the definitions in the document consulted, these being capable of differing between documents.

This article reflects the regulatory framework at the date of checking and serves professional orientation. It does not replace consultation of the municipality or legal advice.

Frequently asked questions

The degree of land use, heights, setbacks and ground coverage. They combine rather than apply in isolation, and that is the main trap.

The one determining the developable area, whose definition is not intuitive. It is set by regulation and checked in the written part.

No, they bound the volume differently and are often more decisive than the ratios. They are checked from the sketch stage.

One scheme can alter the degree of land use in certain cases. Its exact reach is checked in the written part of the plan.