The federal framework and private coding

📐 Article

By , construction economist

Information verified on 5 min read

What you will learn What the federal document actually is and why it is not to be confused with a classification, the difference between enumerative and faceted systems, and why that difference governs the difficulty of linking bills to models.

The Belgian landscape is not limited to the two regional frameworks. A third document circulates, and several classification systems coexist alongside them.

They are not of the same nature, and confusing them leads to errors of method.

The federal document is not a classification

This is the least understood point. The federal document is a technical base text for drafting particular specifications, and not a classification.

The property manager of the federal state distributes a technical document, widely present in Belgian professional tools and available in French and Dutch. It presents it as a base text for drafting particular specifications.

Two points are worth remembering.

Access is free. Its seventeen chapters can be downloaded from the body's website, in French and Dutch, without prior request.

Its texts are old. The articles online bear dates ranging from 1996 to 2007, structural chapters included.

Anyone transcribing a chapter of this document today is therefore transcribing a text frozen for more than fifteen years. That is an elementary check, and rarely made.

Enumerative and faceted systems

This technical distinction is the key to the subject, and it explains a difficulty many practitioners observe without being able to name it. Classifying a work and describing it are two different operations.

An enumerative system organises elements in a single hierarchy, where each item occupies a determined position. The CCTB and the Flemish technical framework belong to that family: their classification is a table of contents, and the index of an element is its position in that table.

A faceted system describes the same object along several independent axes, for instance function, form and material. An object then receives several codes that combine, rather than a single position.

The official Belgian system derived from the international building classification standard, published by the federal body and freely usable, belongs to that second family. It serves to order information rather than to prescribe works.

Why this governs the link with the model

This is the practical consequence, and it explains why attaching quantities remains laborious in Belgium. No automatic bridge exists between classification and bill.

Belgian specification frameworks are enumerative. The systems used to classify model objects are predominantly faceted.

Moving between them is therefore not a simple translation of codes. An object described by several facets must be attached to a single position in a hierarchy, and that operation has no general automatic solution: it depends on the project, the level of detail adopted and the conventions agreed.

Hence the recurring observation: quantities come out of the model, but their attachment to items is redone on every project.

This subject is developed in the article on measurement, BIM and coding. The link between model and bill is covered there.

System Nature What it does
Walloon framework Standard specification Describes the works and prescribes
Flemish framework Standard specification Describes the works, text integrated
Classification derived from the international standard Classification Orders information, does not prescribe
Federal document Technical base text Used to draft particular specifications
Private coding Project structure Stabilises the breakdown from project to project

Private coding systems

Alongside public systems, coding schemes are distributed by software vendors and maintained by practices. Their contractual status depends on the contract that invokes them.

They answer a real need, that of having a stable structure from project to project, but they add a layer to the exchange problem. They add in return one more framework to manage.

Three situations are commonly encountered. They differ by the framework the particular specification invokes.

A practice uses its own internal coding and converts it to the required framework when issuing documents.

A tool imposes its structure and offers correspondences to public frameworks.

A project defines its own coding, often within a digital collaboration protocol, which is recommended practice in a BIM environment but presupposes that all parties comply.

What this means for a professional

Four rules.

Do not present the federal document as the federal counterpart of the CCTB. Its articles date from 1996 to 2007, whereas the CCTB is updated every year.

Check the date of articles transcribed from that document, none of those online being later than 2007.

Identify the nature of the system before attempting a correspondence. Enumerative to enumerative is laborious. Faceted to enumerative is design work, not conversion.

Fix the coding at the start of the project, not when producing the bill. A late choice forces rebuilding what already exists.

This article reflects the position of professional frameworks at the date of checking and serves as orientation. It does not constitute legal advice and does not replace consulting the official sources.

Frequently asked questions

It is a technical base text for drafting particular specifications, according to the body that publishes it, and not a classification. The classification derived from the international standard is a separate tool: it orders information without prescribing the works.

Because classifying a work and describing it are two different operations. That is why no automatic bridge exists between classification and bill.

They answer a real need for a stable structure from project to project. Their contractual status, however, depends on the contract that invokes them.

The one the particular specification invokes. Absent any indication, the choice is documented explicitly in the project protocol.

← Measurement and specification in Belgium