Aller au contenu principal

Guides · France

Guides and in-depth articles on construction cost management.

📐
Complete guide
Guides20 pages

Construction costs in France: cost per m² by building type and the factors that move them (2026)

Construction cost ratios in France by use: housing, offices, public buildings, warehouses, refurbishment. Regional factors and the method for building a reliable budget envelope.

Explore the articles in this guide →
📐
Complete guide
Guides20 pages

Construction cost studies in France: the economist's role, stages and deliverables

Construction cost studies in France: what a construction economist does, the stages of the appointment and the five families of deliverables, from early estimates to tender documents.

Explore the articles in this guide →
📐
Complete guide
Guides20 pages

Construction regulations in France: the complete guide 2026

The regulatory framework of any construction project in France: accessibility, fire safety, the public-building classification, planning permission, the environmental regulations and high-rise.

Explore the articles in this guide →
📐
Complete guide
Guides11 pages

The design team work stages in France: a complete guide to how a construction project unfolds

The French design team work stages, from first sketch to handover: the role of the design team, the design stages, the tender process and the works on site.

Explore the articles in this guide →
📐
Complete guide
Guides15 pages

The economic risks of a construction project: the complete picture

A map of the ten families of economic risk in construction: the matrix of risks against project stages, probability and scale, and the return on prevention.

Explore the articles in this guide →
📐
Complete guide
Guides14 pages

The construction economist's tools and methods: the complete picture

Priced bills, pricing schedules, specifications, quantities, tender comparison schedules, final accounts, the seven families of tools mapped stage by stage.

Explore the articles in this guide →
📐
Complete guide
Guides12 pages

Refurbishment economics in France: the economist's tools and methods

Eight families of tools, benchmark rates by type of work, eight key differences from new build, and the strip-out and survey items new build never carries.

Explore the articles in this guide →
📐
Complete guide
Guides12 pages

Public procurement economics in France: the economist's role end to end

What separates public procurement from private contracts, the economist's role stage by stage, and the fifteen operational reflexes to have as a matter of course.

Explore the articles in this guide →
📐
Complete guide
Guides7 pages

Reducing construction costs: the design decisions that fix them from the sketch stage

Reducing construction costs from the sketch stage: six design decisions compared on one 40-home example project, changing a single assumption at a time.

Explore the articles in this guide →
Votre prochain dossier

“Votre prochain dossier, on s'en charge.”

L'économie de la construction à la demande, pour les cabinets d'architectes.

Demander ma revue offerte
Lancement sous 72h ouvréesLivrables à vos couleurs