Skip to content

What to watch next

📐 Article⏱ 6 min read

What you will learn The national plan and its deadline, the intended change in the logic of support, the volumes to 2035, what has already changed, and what it means in practice.

The support system is not permanent. The intended change is one of principle, and it concerns above all those who are still weighing up a renovation.

1. The national plan and its deadline

The single most important document to watch. It sets the direction for the years ahead.

The Ministry of Climate drew up the Estonian national building renovation plan for 2050, and at the date of verification the plan was at the feedback stage with its final version due in December 2026. The document is publicly available.

The plan describes objectives, volumes and measures, and future support measures will be shaped on the basis of it, which means the post-2027 support system depends on this document. The final content of the plan may differ from the initial version, so this article describes the initial version.

2. The intended change in the logic of support

Here is the change that concerns a homeowner most directly. It concerns the rate of support.

Direction Content
The main form of support making finance more affordable
The instruments for instance loan guarantees and co-lending measures
Non-repayable grants directed above all at less well-off households
Non-financial support technical advice, standardised energy performance procurements, digital tools

This is a shift of principle, because the present model distributed percentage-based support to a wide group, whereas the intended one directs the grant more narrowly and offers others cheaper finance. Anyone weighing up a renovation should allow for this in their timing, since the conditions may move in either direction.

3. The volumes to 2035

Three figures give the order of magnitude, and a fourth ties them to the logic of the ranking. Competition determines the outcome.

Indicator Value
Private and public sector investment 2026 to 2035 approximately 8.5 billion euros
The state's contribution to grants and financial measures about 1.5 billion euros
Reduction in the average primary energy consumption of the housing stock by 2035 20 to 22 per cent

More than half of that reduction has to come from renovating the worst-performing residential buildings, which make up approximately 43 per cent. It follows that the buildings in the worst condition will remain a priority, which is consistent with the present logic of the ranking.

4. What has already changed

One change took effect in the third round and is worth knowing. It concerns the award criteria.

According to professional sources, support is no longer allocated by how quickly an application arrives, unlike in the previous rounds; applications are instead ranked on the basis of the energy delivered to the building. According to the same source, the energy performance certificate calculations for one's building in the building register should therefore be checked, so that the data are valid and correct at the moment of applying.

This confirms the starting point of the whole guide: having the register data and the energy performance certificate in order is not a formality but what determines one's place in the ranking. According to the same source, attention is also paid to areas with lower incomes and property values.

5. What it means in practice

Three recommendations, and the first is the quickest and the most effective. It concerns putting the register data right.

Check the energy performance certificate data in the register before the round opens, since that determines the place in the ranking and it can be done straight away. Watch for the final version of the national plan where the decision is a long-term one. And do not assume that the present support rate will apply in the next round.

Summary and four practical rules

The national building renovation plan for 2050 was at the feedback stage at the date of verification and was due in December 2026, and the post-2027 support system depends on that document. The intended change is one of principle: the main form of support becomes making finance more affordable through loan guarantees and co-lending, with non-repayable grants directed above all at less well-off households. The third round abandoned allocation by speed of application and ranks applications by energy use, so the state of the energy performance certificate calculations determines one's place in the ranking.

Four rules: check the energy performance certificate calculations in the register before applying. Watch for the final version of the national renovation plan. Allow for direct grants moving towards less well-off households. Do not plan a long-term project on the assumption of the present support rate.

This article offers professional orientation as at the date of verification. It describes the initial version of the plan.

Frequently asked questions

The Estonian national building renovation long term plan drawn up by the Ministry of Climate, which is publicly available. It sets the direction for years ahead.

Changes in the rate of support, which affect the size of the own contribution. They have to be checked in the conditions of each round.

One change concerns the award criteria and is worth knowing before an application is prepared. The criteria affect the position in the ranking.

Three recommendations, the quickest and most effective being to put the register data right. It depends on no round and no decision.

← Renovating apartment buildings and houses in Estonia