A price per square metre is a fraction. Most attention goes to the numerator, but the denominator decides the result just as much.

1. Why the denominator matters as much

A simple observation that is often forgotten in practice. The price per square metre depends on the definition of area.

For the same building and the same total cost, a smaller area gives a higher price per square metre. Two quotations can therefore show different prices per square metre although the total cost is identical. And conversely: a lower price per square metre may come from a larger area, not from cheaper building.

A price per square metre without an area definition is therefore not a figure but a ratio with an unknown base. The definition is requested with the figure.

2. Which area concepts are used

Several concepts occur in Estonian practice and documents, and their content does not coincide. They are often used interchangeably.

Concept General content Typical context
Gross area generally includes the area occupied by structure largest figure
Enclosed net area generally excludes structure smaller figure
Heated area area under heating energy performance
Useful area definition depends on context variable

The precise definitions derive from the applicable standards and legislation, and this guide does not reproduce them. The definition must be taken from the source the quotation refers to.

What matters is not knowing the list by heart but knowing that they differ, and that the same building can appear in two documents with different square metre figures without either being wrong. The difference is checked each time.

3. Where differences arise

Four places where areas most often diverge. They concern external walls and unheated rooms.

Place Why it diverges
Treatment of structure the largest single difference between gross and net
Partly heated or unheated rooms plant rooms, stores
Low headroom areas under a pitched roof, treatment depends on the rule
Terraces, balconies, canopies attached to the building but not enclosed

The fourth row causes the most disagreement, because these areas cost something, but not as much as enclosed space. Counting a terrace in full lowers the price per square metre artificially; excluding it raises the figure.

4. What to ask

Three questions settle the matter before a dispute. Which area the price refers to, stated, not assumed.

How terraces, balconies and unheated rooms have been treated. Their treatment changes the figure materially.

Which document or standard the definition rests on.

The third is the most useful, because it leads to the source of the definition and ends the interpretation. The answer either exists or it does not, and both are informative.

5. One simple recommendation

One measure removes most of the problem: compare total cost, not price per square metre. Total cost is unambiguous and verifiable.

A price per square metre is useful as a first order of magnitude and for comparing buildings across different projects. For comparing two quotations for the same project, total cost is unambiguous, provided the completion level is the same.

This recommendation does not destroy the value of a price per square metre, it delimits its correct use: it is an orientation tool, not a comparison tool. It frames rather than decides.

In summary, and four practical rules

A price per square metre is a fraction, and the area definition decides the result as much as the cost. Gross area, enclosed net area, heated area and useful area do not coincide, and their precise definitions derive from standards rather than custom. The most disagreement arises over terraces, balconies and canopies, which cost something but not as much as enclosed space.

Four rules: ask for the area definition with every price per square metre given. Do not compare prices per square metre without the same denominator. Clarify the treatment of terraces and unheated rooms. Use total cost to compare two quotations.

This article serves professional orientation at the date of checking. It is not a quotation.

Frequently asked questions

That depends on the area definition used, and there are several. Without a definition a price per square metre is not a figure.

Several, and their content does not coincide. What matters is not the list but knowing that they differ.

In the treatment of terraces, balconies and unheated rooms. They change the figure materially.

Compare total cost rather than price per square metre. Total cost is unambiguous and verifiable.