What the price of a facade includes
The price per square metre of a facade is not only the outer cladding. It becomes comparable once it is known which layers it includes:
- the load-bearing or infill wall, if it is part of the facade price;
- insulation and wind barrier;
- substructure and fixings;
- the outer cladding and its finish;
- windows and doors, if they are included in the price;
- flashings, window reveals and junctions.
Two quotations, one of which includes the windows and the other not, are not comparable, even though both are in euros per square metre. The same logic is described in the article why two quotations are not comparable.
Systems on the example project's facade
Estonian apartment buildings often use four families of systems. Their prices depend on the project, and public sources do not give comparable prices per square metre, which is why the table shows only their characteristics.
| System | Construction | Maintenance | Worth knowing |
|---|---|---|---|
| Rendered insulation | simple, few layers | render needs repainting and repairs over time | impact resistance on the ground floor is a weak point |
| Ventilated panel cladding | the substructure adds work | little maintenance | the choice of panel strongly affects the price |
| Timber cladding | light, quick to install | needs periodic treatment | fire safety requirements depend on the building's height and class |
| Brick cladding | more work and load-bearing capacity | very little maintenance | needs support on the foundation and ties |
The choice of system also affects other works. Brick cladding needs support on the foundation, ventilated panel cladding stronger fixings and timber a fire safety solution. The real price of a facade is therefore the price of the system together with these effects.
Window area weighs as much as the system
Windows are usually more expensive per square metre of facade than wall. If the example project's window proportion is 25 %, the window area is approximately 330 m² and the solid wall area approximately 990 m². If the proportion rises to 35 %, the window area grows to approximately 460 m².
A larger window area also affects energy performance. New buildings must meet the requirements for a liginullenergiahoone (nearly zero-energy building), and large glazed areas may require better windows, shading or cooling, which add costs outside the facade. The window area decision must therefore be made together with the energy calculation, not on architectural grounds alone.
Keeping the architectural idea with a cheaper system
The architectural idea need not be tied to an expensive system. The same effect can often be achieved if the expensive material stays where it is seen most, for example on the ground floor and around the entrances, and the upper storeys get a simpler system.
Another option is to reduce the number of details. Every change of material, corner and window reveal adds work and junctions, which are the most error-prone part of a facade. A simpler rhythm with the same material can produce stronger architecture and cheaper construction.
These decisions must be made before the building permit drawings. Once the building permit has been granted, changing the facade may require the permit to be amended, and during construction it is additional work whose price is not set by competition.
Maintenance paid for after completion
The price of a facade does not end at handover. Render needs painting, timber needs treatment, and all systems need their flashings and junctions inspected. If the developer sells the flats, these costs are borne by the flat owners, and the cheapest construction solution may be more expensive over the whole period of use.
The trade-off between maintenance costs and the construction price is covered in the article building life-cycle costs. For the facade, it is important to ask how often and with how large a scaffold maintenance must be carried out, because maintaining the facade of a four-storey building requires a lift platform or scaffolding.
Summary
The price of a facade depends on the system, the window area and the number of details. Of the example project's 1,320 m² facade, at 25 % window area approximately 330 m² is windows, and changing that proportion affects the price as much as the choice of system. The architectural idea can often be kept if the expensive material stays where it is visible and the number of details is reduced.
Legal sources: riigiteataja.ee, Building Code (ehitusseadustik); regulation no. 63 of the Minister of Entrepreneurship and Information Technology “Hoone energiatõhususe miinimumnõuded” (minimum energy performance requirements for buildings, § 6, § 20); regulation no. 17 of the Minister of the Interior “Ehitisele esitatavad tuleohutusnõuded” (fire safety requirements for buildings, § 21, annex 7). Checked on 26 November 2026.