Guides · Spain
Guides and in-depth articles on construction cost management.
Construction cost per m² in Spain: ratios by building type
Construction cost ratios per m² in Spain in 2026: housing, offices, industrial buildings and renovation, with indicative ranges by typology.
Explore the articles in this guide →Quostra Software: early access from January 2027
Quostra tests your budget against what the project really costs and tells you what would make it overrun. From feasibility to bid analysis, even without drawings.
See the software →Quantities and budgets in Spanish construction: complete guide
Complete guide to construction quantities and budgets in Spain: structure, unit price breakdowns, progress certificates and cost control.
Explore the articles in this guide →The CTE: Spain's building code, its basic documents, requirements and compliance cost
Complete guide to the CTE, Spain's building code: structure, basic documents, requirements and compliance cost for design and budgeting.
Explore the articles in this guide →Phases of a construction project in Spain: from basic design to handover
The phases of a construction project in Spain: feasibility, design, permits, construction and handover, with the agents of each stage.
Explore the articles in this guide →Public works tenders in Spain: Ley 9/2017, procedures and award
Public works tenders in Spain: the Ley 9/2017 framework, procurement procedures, award criteria and contract execution. A complete guide.
Explore the articles in this guide →Construction budget control for the client in Spain: setting it, checking it, holding it
Construction budget control in Spain: set it before design, check the design estimate, procure the works, track final cost and choose who controls it.
Explore the articles in this guide →Reducing construction costs: the design decisions that set the cost from the feasibility study
Reducing construction costs for an apartment building in Spain: the six design decisions that set them, compared on an example of 30 homes on ground plus four.
Explore the articles in this guide →