How developed-design quantities are organised by work package

📐 Article8 min read

A developed-design measure is not a list of raw figures. It is a structured, hierarchical document organised on a logic the architect, the client and the future contractors must be able to read easily. Understanding how it is structured — which trades it contains, how they break down into items, what logic governs their organisation — is what allows it to be used as a real steering instrument rather than as a total at the foot of a page.

Why organise by trade?

Breaking the measure down by trade is not an arbitrary convention; it reflects the real structure of the construction market. Each trade corresponds to a contractor speciality: the mason, the carpenter, the plumber and the electrician have neither the same skills, nor the same teams, nor the same prices. Organising the measure on that logic achieves two essential things.

First, it prepares the structure of the future tender package directly: each trade in the measure becomes a package in the tender documents, with its own specification and its own pricing schedule. Continuity from developed design to tender is thereby guaranteed without restructuring the document.

Second, it allows a budget reading by responsibility: architect and client can see at once which trade carries most weight, where the trade-offs are concentrated, and which packages have been prioritised for negotiation.

The typical structure

The table below sets out the standard organisation of a developed-design measure for a new-build project in France, with the principal items of each trade and their average budget weight.

Package / trade Principal items at developed design Usual units Average budget weight, new build
01: Structure Earthworks, foundations, masonry, floors, stairs, slabs m³, linear m, m², no. 30 – 40 %
02: Roof structure and covering Timber or steel frame, roofing, waterproofing, rainwater m², linear m, lump sum 5 – 10 %
03: Façades and external walls Insulation, external or internal, cladding, render, balustrades m², linear m 6 – 12 %
04: External joinery Windows, glazed openings, French doors, shutters, entrance door no., m² 5 – 9 %
05: Heating, ventilation and cooling Heating, ventilation, cooling, hot water generation lump sum, no. 10 – 15 %
06: Plumbing and sanitary Foul, surface and cold water services, sanitary fittings lump sum, no. 7 – 12 %
07: Electrics, power and data Distribution board, power and data services, lighting lump sum, no. 7 – 12 %
08: Internal joinery Doors, fitted cupboards, lightweight partitions no., m² 3 – 6 %
09: Floor finishes Tiling, timber, carpet, resin 4 – 7 %
10: Painting and finishes Paint to walls and ceilings, suspended ceilings 3 – 6 %
11: External works and surroundings External services, roads, landscaping, fencing lump sum, m², linear m 3 – 7 %

Note: the budget weights are indicative for standard new-build apartments. They vary significantly with the building type — public buildings, offices, refurbishment — and with the level of specification. On refurbishment the façade and insulation package can reach 20 to 25 % of the total.

The hierarchy of the breakdown

Within each trade, the measure is organised in several hierarchical levels. This tree structure allows reading at different degrees of precision, from the package total down to the elementary item, and anticipates the structure of the specification that will be written at the detailed design stage.

Level Designation Example, structural package
Level 1 Trade (package) 01: Structure
Level 2 Family of works 01.02: Foundations
Level 3 Elementary item 01.02.01: Reinforced concrete strip footings 300 × 600
Level 4 (tender) Price build-up C25/30 concrete, high-yield reinforcement, permanent formwork…

At developed design the measure generally descends to level 3, the elementary item, with a description sufficient to measure the quantities and apply a representative unit rate. Level 4, the price build-up, is reserved for the tender stage, where every element must be described with contractual precision.

Developed design or tender: how deep does each go? At developed design one writes: "Reinforced concrete strip footings 300 × 600, 85 linear m, 420 €/linear m, 35,700 €". At tender, in the specification and pricing schedule, one adds: C25/30 concrete, reinforcement from 8 to 16 mm, permanent formwork of a stated type, reinforcement to the engineer's drawings, minimum bearing capacity 200 kPa, the price revision formula, and so on. Developed design gives the volume and the cost. The tender documents give the qualitative and contractual requirements.

The packaging choices that shape the reading

One package or several for the same trade

For some trades the economist can choose to group work into a single package or split it into distinct ones. External joinery, for instance, can be grouped with the façades into an "external envelope" package, or separated in two, according to the size of the project and the tendering strategy.

The choice has direct consequences for competition at tender: too broad a package shuts out local craftsmen, too small a one lacks the critical mass to attract specialist contractors. The economist must judge according to the size of the project and the local contractor base.

Packages with critical interfaces

Some packages share close technical interfaces that require precise organisation in the measure. The main ones are:

  • Structure and mechanical services: the openings in concrete floors and walls for services to pass through must be coordinated between the structural and services engineers. A measure that ignores these interfaces systematically under-values the structural package.
  • Mechanical services and electrics: power supply to the mechanical plant, controls and building management sit on the boundary between the two packages. Where that boundary lies must be explicit from developed design onward.
  • External joinery and façades: installing the windows, the reveal linings and the vapour barriers are frequent sources of dispute if the boundary of each package is not clearly defined.

Handling cross-cutting items

Some items affect several trades and must be allocated to one of them coherently and with the allocation documented. This applies to site set-up — generally with the structural package, or as a separate package on larger projects — temporary protection, final cleaning, and testing and inspection.

A frequent error Leaving cross-cutting items out of the measure on the assumption that they will be distributed between packages at tender. With no explicit rule, each contractor tends to exclude them from its offer, and they reappear as variations. The rule: every item must be allocated to a specific package in the measure, even if its exact definition will be refined at tender.

How the document is presented

The header of each trade section

Each section opens with a reminder of the calculation assumptions specific to that trade: the drawings used, the sizing assumptions adopted in the absence of structural drawings, the level of specification taken. That transparency is indispensable if the document is to be reviewed critically and updated as the project evolves.

The general summary

The document closes with a general summary bringing together the amount of each trade, the global contingency and the project total excluding VAT. It is this summary page that goes to the client to approve the budget envelope before the detailed design and tender stage is launched.

The delivery format

A developed-design measure is delivered in Excel, so that quantities or unit rates can be updated, and in PDF for reading and archiving. Word is reserved for accompanying notes. The economist can also deliver in the format of a commercial price database if the client wants continuity with their own control tools.

Developed-design structure at Quostra

Quostra produces measures structured on the logic described here, adapted to each project type. The document is delivered as a structured Excel workbook with one tab per trade and a summary tab, the assumptions documented in each section and a general summary on the front page.

That structure is directly reusable as the basis of the tender package: trades become packages, items become the articles of the specification and the lines of the pricing schedule, with no wholesale restructuring.

You have better things to do. Submit your project on quostra.com and an economist structures and produces your developed-design measure within 72 working hours.

In summary

A well-structured developed-design measure is organised by trade, broken down into families of works and then into elementary items, with explicit assumptions and a summary. That organisation is not a formality: it prepares the structure of the tender package directly, makes technical trade-offs easier, and guarantees that every item is allocated to a specific package with no contractual grey area. It is the foundation of rigorous pricing and of a tender without surprises.

Construction cost studies in France: the economist's role, stages and deliverables
Votre prochain dossier

“Votre prochain dossier, on s'en charge.”

L'économie de la construction à la demande, pour les cabinets d'architectes.

Déposez votre projet
Lancement sous 72h ouvréesLivrables à vos couleurs