What software does a construction economist use in France

📐 Article

By , construction economist

Information verified on 8 min read

What you will find in this article The construction economist is invisible in the software architects use every day, Revit, ArchiCAD or AutoCAD. The work runs on its own tools: measurement packages, price libraries, purpose-built spreadsheets, model-based measurement and, more recently, automation platforms.

The question is no longer only which package the economist uses. For a practice, it is whether to learn these tools or hand the cost work to someone who already masters them. This guide covers the economist's digital toolkit, with an honest view of what works, what is overrated and what is changing.

1. The reality on the ground: the spreadsheet still dominates

Before talking about specialist packages, there is a truth software vendors do not enjoy hearing: most construction economists in France work mainly in a spreadsheet. Not for want of anything better, but because a spreadsheet is infinitely adaptable. A good model built by an experienced economist is often more powerful and faster than a specialist package for the everyday needs of a standard project.

The specialist packages bring real value on two precise points: the built-in price libraries, which save building your own rate base, and the automatic formatting of the deliverables in standard layouts. On everything else, the calculation logic, the structure of the schedules, the flexibility, the spreadsheet remains hard to beat.

2. The full picture: tools by category

Five families of tools share the economist's desk: measurement on drawings, estimating and pricing, price libraries, model-based measurement and project monitoring. The table below lists their main representatives on the French market.

Category Tool Publisher Main use
Measurement and estimating Attic+ ATTIC+ Measurement, estimates, pricing schedules, priced bills
Measurement and estimating Spreadsheet, purpose-built Microsoft Bespoke estimates, dashboards, final accounts
Price library Batiprix Groupe Moniteur Unit rate reference across every trade
Price library INSEE construction indices INSEE Price adjustment indices for parametric formulas
Model-based measurement Revit with extensions Autodesk Quantity extraction from a well-developed model
Model-based measurement ArchiCAD with extensions Graphisoft Quantities from an ArchiCAD model
Model-based measurement CostX RIB Software 2D and 3D measurement, model-based quantities
Programme and control MS Project Microsoft Gantt programme, time and resource control
Programme and control Planradar PlanRadar Mobile site records, snagging, inspections

3. Measurement on drawings: measuring straight from the PDF or DWG

Measuring from paper drawings has given way to packages that measure directly on the file, PDF or DWG, with dimensioning, counting and area tools. The choice depends mainly on the size of the projects and the trades involved.

Attic+ remains the reference in cost consultancies for measurement and its transfer into the estimate. PlanSwift measures on PDF drawings and exports to a spreadsheet, and is found mostly on large projects. Bluebeam Revu, a widely used PDF markup tool, offers simple measurement functions that are enough for ordinary projects. Teams already equipped with AutoCAD can measure on the DWG with dedicated extensions, at the cost of a less comfortable interface.

4. The four indispensable tools

Four tools turn up in almost every practice, for different reasons: one for the whole workflow, one for prices, one for adjustment, and the last for everything the other three cannot do.

Attic+, the profession's standard

Attic+ is the package most used in French cost consultancies. It covers the whole economic workflow: entering measurements, calculating estimates, producing priced bills and pricing schedules, managing price libraries. Its main strength is its integrated price library, so the economist does not have to build a rate base. Its main weakness is a long learning curve, three to six months before real productivity, and an ageing interface.

Batiprix, the price reference

Batiprix is the sector's reference price base. It covers every trade; a new edition comes out each year, and the prices in the online version are updated every month. It serves as a checking reference, in particular for economists working in a spreadsheet. Its subscription is regarded as an unavoidable investment for any practice with a regular workload.

The INSEE construction indices, free and indispensable

The building cost indices (BT) published monthly by INSEE are the basis of the price adjustment formulas in building works contracts, public works having their own indices (TP). Free to download, they are used to update estimates and to calculate the adjustment in final accounts. An economist who does not consult them regularly produces incomplete final accounts.

The spreadsheet, the general-purpose tool

The spreadsheet remains central for financial dashboards, final accounts, tender comparison schedules and every bespoke document that does not fit the layouts imposed by the specialist packages. An economist with advanced spreadsheet skills, conditional formulas, pivot tables, conditional formatting, simple macros, can produce professional-quality deliverables with no specialist software at all.

5. Model-based measurement: the promise and the reality

Extracting quantities automatically from a digital model is the promise that has fascinated the sector for ten years. In theory, a properly built model lets you extract the quantities of concrete, partitions and façades automatically and feed them straight into the estimate.

In practice the obstacles are many. The model has to be developed to a sufficient level of detail with every element correctly categorised, which is not the case for most models produced in French architectural practices. Interoperability between the modelling software and the cost packages remains imperfect, and exports frequently lose critical information. And validating the extraction remains indispensable: the economist has to check that the quantities extracted follow the French measurement rules, which takes an expertise automation does not replace.

Specialist packages such as CostX extract quantities directly from an IFC model and match them against a price base. IFC, the neutral exchange format of BIM, can be read by most recent estimating tools. But the quantities are only as good as the model: a badly structured model produces wrong quantities, which only a check against ratios will catch.

Model-based measurement: where does it really stand? The practices using it productively are the ones that have invested in a strict modelling procedure, with a modelling protocol defining the minimum requirements for categorisation and parameters. On large projects, above 5 000 m², the time saved on measurement is real and can reach 30 to 50 % of the take-off stage. On ordinary projects, below 2 000 m², the time spent checking the extraction often exceeds the time a manual take-off would have taken.

6. What is changing: AI and automation

Artificial intelligence is entering estimating through simple functions, such as recognising the rooms on a drawing to extract their areas, and is gradually taking on more complex tasks. The first specialist platforms already produce an estimate and written documents from a plain description of the project, with no drawing to measure.

These tools do not remove the economist's judgement. They shift the work: less data entry and formatting, more checking and decision-making. For a practice with no in-house economist, they mainly change the starting point, since a first estimate becomes possible at sketch stage.

7. Spreadsheet, specialist package or external economist: the honest comparison

The real question for an architect or a client is not which package the economist uses, but how to obtain reliable cost advice quickly. The table below compares the three genuine options.

Criterion Spreadsheet alone Specialist package External economist
Cost of entry Included with the office suite A licence of 2 400 to 5 600 €, optional maintenance at 15 % a year No licence and no training, a fee for each assignment
Learning curve Long, for a bespoke model Three to six months to master None; the economist brings the tools
Price library To be built yourself Integrated or compatible The economist's own; ask where the rates come from
Quality of the quantities Depends on the user's level Good if well configured Depends on the economist chosen; check it before issue
Delivery time Variable, depends on workload Variable, depends on workload Agreed when ordering; have it confirmed in writing
Availability Depends on the internal diary Depends on the internal diary Engaged assignment by assignment, subject to workload
Liability Internal, carried by the practice Internal, carried by the practice Set by the contract with the economist
Suits which profile A practice with a trained in-house economist A practice with a dedicated economist A practice with no in-house economist, or one that is overloaded

The conclusion is simple. If you have an in-house economist or a trained colleague, a specialist package adds value. If you do not, or if your economist is overloaded, learning a new package to produce one estimate a quarter is neither efficient nor economic: the training time far exceeds the time it saves.

In summary

The spreadsheet remains the central tool of most French economists, for its flexibility rather than for want of an alternative. Attic+ is the standard in specialist consultancies for measurement and estimating, Batiprix the price reference, and the INSEE indices are free and indispensable for price adjustment. Model-based measurement delivers on rigorously built models, which remain the exception, and automation platforms are starting to produce estimates from a plain description.

For architects and clients with no in-house economist, the question is therefore not mastering one more package. It is choosing between an external economist, who brings the tools with them, and a platform that produces the documents from the project.

The nature of the figures quoted

The percentages and amounts quoted on this page are orders of magnitude for framing, not measurements. They illustrate mechanisms and proportions, and they substitute neither for a tender exercise nor for an estimate prepared on drawings.

Sources: the BT construction cost indices published monthly by INSEE on its 2010 base, used to update the figures · construction cost statistics from SDES, the statistical service of the ministry responsible for construction · regulatory texts published in the Journal officiel and consolidated on Légifrance for the requirements cited.

← The construction economist's tools and methods: the complete picture