A foreign policy is not always enough

📐 Article⏱ 5 min read

What you will learn The rule applying to service providers, the three dimensions to check, the solution where cover falls short, and when to check.

A firm insured at home is not necessarily covered in Luxembourg. Official sources say so explicitly for certain professions, and the reasoning holds more widely.

The rule applying to service providers

The official sources consulted state a clear rule for liberal-profession providers. The cover must extend to Luxembourg territory.

The provider must hold professional indemnity insurance covering their activity and that of their employees.

Where the policy taken out in the country of origin does not cover the entirety of the statutory and contractual liability incurred in Luxembourg, the provider must adapt their insurance or take out specific cover.

Two distinct notions appear here: statutory liability, arising from the law, and contractual liability, arising from the contract concluded.

A policy may cover one without covering the other, and the wording requires the entirety of both.

The burden of checking falls on the provider, not on their insurer or their client.

Dimension to check Question to ask Effect if inadequate
Territorial scope Does the policy cover Luxembourg No cover
Material scope Are the activities carried on covered Exclusion of cover
Sums insured Are they suited to the project Partial cover

The three dimensions to check

They are cumulative.

Territorial scope. Does the policy cover works carried out in Luxembourg, and not only in the country of establishment.

Material scope. Does the policy cover the entirety of the statutory and contractual liability incurred in Luxembourg, including the post-handover guarantee regimes.

The sum insured. Is the limit appropriate to the value of the works concerned.

The second dimension is the hardest to check, since it means comparing a foreign liability regime with a Luxembourg one.

A territorial extension therefore is not enough: covering Luxembourg geographically does not mean covering the liabilities incurred there.

The solution where cover falls short

Two routes, stated by the official sources. They allow insufficient cover to be regularised.

Adapt the existing insurance, by extension or endorsement with the home insurer.

Take out specific cover for the activity in Luxembourg.

The choice between them is for the insurer and broker, and depends on how often the firm works there.

A firm working regularly in Luxembourg is better served by settling this question once, rather than project by project.

When to check

A decisive point of method.

Checking must take place before the bid is submitted, not before work starts.

Adapting a policy has a cost, which must appear in the price.

A firm discovering the shortfall after being appointed bears that cost out of its margin, with no way of passing it on.

This reasoning mirrors that applying to the mandatory rules, set out in the corresponding article: cost elements linked to cross-border work are checked at the pricing stage.

What to ask your insurer

Four precise questions, to be put in writing. They are addressed to the insurer before the work starts.

Does my policy cover works carried out in Luxembourg.

Does it cover the entirety of statutory liability incurred in Luxembourg, including post-handover guarantees.

Does it cover contractual liability arising from contracts concluded in Luxembourg.

Is the sum insured appropriate to the value of the works concerned.

A written answer is what protects, an oral confirmation having no value in the event of a claim.

What this means for a professional

Four rules.

Check before pricing, adaptation having a cost.

Distinguish territorial from material cover, the first not standing for the second.

Obtain written confirmation from the insurer, expressly addressing Luxembourg.

Settle the question globally where you work there regularly, rather than project by project.

This article reflects the rules at the date of checking and serves professional orientation. It does not constitute insurance advice.

Frequently asked questions

Not necessarily, the official sources consulted stating a clear rule for providers. The cover must extend to Luxembourg territory.

Three dimensions: territorial scope, material scope and the sums insured. A shortfall on any one leaves the project uncovered.

Two routes exist, stated by the official sources, to extend the cover or take out a local policy. They are used before the works begin.

Four precise questions, put in writing, on territory, activities, sums and exclusions. A written answer is worth more than a general certificate.