The path to zero-emission buildings

📐 Topic⏱ 6 min read

What you will learn What the directive sets as its objective, the state of transposition, what is already known, the renovation trajectory, and what it means for design today.

A nearly zero-energy building is not the end point. The next level is the zero-emission building, and its deadlines are already fixed, even if the details are not.

1. What the directive sets as its objective

According to information published by the Ministry of Climate the aim is clear, and broader than new construction. It concerns the whole building stock.

The energy performance of buildings Directive 2024/1275 sets the objective of renovating the existing building stock to be highly energy efficient and reaching a climate-neutral building stock by 2050, with the focus on reducing energy consumption and energy waste. The objective runs over a long period.

The objective therefore concerns the whole building stock, not only new buildings: requirements for new buildings are one part of it, renovation of existing ones the other and larger part. The existing stock dominates by volume.

2. The state of transposition

Precision is required here, because the situation is unclear and guessing would be harmful. The state of transposition must be checked.

According to information published by the Ministry of Climate the directive had to be transposed by 29 May 2026, and the ministry invited sector stakeholders to contribute to the transposition. At the time this article was verified it was not possible, on the basis of the sources available, to confirm that transposition had been completed.

This does not mean it has not been done, but that it must be checked against the legislation in force. The practical recommendation is short: before relying on the 2027 and 2030 deadlines, check which requirements are in force in Estonian law.

3. What is already known

Three things follow from the directive and are therefore known in advance, even before transposition is confirmed. They concern the targets and the deadlines.

What When
New public buildings must be zero-emission from 2027
All new buildings from 2030
All new buildings to be designed so as to optimise their solar energy generation potential based on the solar irradiance of the location from 29.05.2026

The third row is the only one whose deadline has already passed, and it affects design now rather than in the future. It is covered by the article on solar energy and roof area.

4. The renovation trajectory

Numerical targets have been set for the existing building stock, and they are frequently misread. The targets are tied to deadlines.

Deadline Reduction in average primary energy consumption of residential buildings (2020 = baseline)
2030 at least 16 %
2035 at least 20 to 22 %
2040 and every five years thereafter equal to or lower than a nationally determined value

These are national-level targets, not requirements for individual buildings, and the distinction is worth keeping, because conflating them creates a false expectation about a specific renovation project. How these targets translate into requirements for individual buildings will emerge in transposition, and that is currently open.

5. What it means for design today

Three consequences apply already, before the new requirements enter into force. They concern design and investment.

Accounting for solar potential is already a requirement rather than a future question. A project whose completion reaches towards 2027 or 2030 has to be planned with the future requirement in mind, even where it does not yet apply. When planning a renovation it is worth allowing for the fact that requirements move in one direction, and today's minimum is likely to be tomorrow's starting point.

The second point is particularly relevant for large projects, where years pass between design and the occupancy permit: a requirement that does not apply at the moment of application may be in force before the building is taken into use. Requirements can change during the project.

Summary and four practical rules

Directive 2024/1275 sets the objective of a climate-neutral building stock by 2050 and concerns the whole building stock rather than new construction alone. New public buildings must be zero-emission from 2027 and all new buildings from 2030, while optimising solar energy generation potential has been a requirement since 29 May 2026. The average primary energy consumption of residential buildings must fall by at least 16 per cent by 2030 and 20 to 22 per cent by 2035 against 2020, but these are national-level targets rather than requirements for individual buildings.

Four rules: check the requirements in force in Estonian legislation, not in the directive. Account for solar potential today, since that deadline has passed. Plan projects reaching towards 2027 and 2030 with the future requirement in mind. Distinguish national targets from individual building requirements when explaining a renovation schedule to a client.

This article offers professional orientation as at the date of verification. It replaces neither the regulations in force nor the assessment of a competent specialist.

Frequently asked questions

The directive sets the objective of transforming the building stock into zero-emission buildings. It concerns the whole stock, not only new buildings.

The state of transposition must be checked in an official source. Guessing would be harmful here.

Three things concerning the targets and the deadlines. They hold even before transposition.

Above all large projects whose design runs for years. Requirements can change during the project.

Explore the articles in this guide