Guides · Italy
Guides and in-depth articles on construction cost management.
Construction costs per m2 in Italy: values by building type
Construction costs per m2 in Italy by type: residential, commercial, industrial and renovation, with north-south gaps. A complete guide.
Explore the articles in this guide →Quostra Software: early access from January 2027
Quostra tests your budget against what the project really costs and tells you what would make it overrun. From feasibility to bid analysis, even without drawings.
See the software →The computo metrico estimativo: from preparation to price books and specification
The Italian priced bill of quantities: how it is prepared, which prezzari apply and how it connects to the specification and the cost framework.
Explore the articles in this guide →Building consents in Italy: permesso di costruire SCIA and CILA
Italian building consents: permesso di costruire, SCIA, CILA and permit free works, with lawful status, retrospective consent and the contribution.
Explore the articles in this guide →Public works and technical services contracts in Italy: a guide to the code
Italian public contracts: award procedures, requirements, tender and award, performance, and engineering and architecture services.
Explore the articles in this guide →Building tax incentives in Italy: a guide to the deductions
Italian building tax incentives: rates in force, who can claim, technical formalities, calculating the deduction and revenue agency audits.
Explore the articles in this guide →The client's construction budget in Italy: setting it, checking it, holding it
Construction budget in Italy for the client: set it before design, check the estimate, award the works, track variations and the final cost.
Explore the articles in this guide →Reducing construction costs in Italy: the design decisions that fix the cost before detailed design
Reducing construction costs of an apartment building in Italy: the six design decisions that weigh most, measured on a 12-flat example, and the right order.
Explore the articles in this guide →