Bids come in over budget. You could have known sooner.
Quostra sets your budget against what the project really costs, from the feasibility stage. You see what would make it overrun while there is still time to decide.
Seven markets, each with its own standards, prices and practices
France, Belgium, Luxembourg, Germany, Spain, Italy, Estonia. More than 17,500 tasks across 29 packages.
One question, at every stage.
Quostra models the building, establishes its own benchmark, then sets it against what is in front of you. To judge a figure, or to anticipate the questions it will raise before you present it.
- 01 · FeasibilityBefore committing to the project
Does the project fit the budget?
Describe the scheme in a few sentences and give the figure it has to meet: a cost envelope, a budget, a fee. Quostra tells you whether it holds, with what margin, and which decisions would make it overrun.
From launch - 02 · CompletenessBefore going out to tender
Are the tender documents complete?
Upload your documents as they are. Quostra picks out the work the building requires and the documents do not cover: gaps that contractors will price in their own way, or claim as extras.
During early access - 03 · TendersWhen tenders are opened
Are the bids priced right?
Upload the contractors' bids as they come in. Quostra sets them beside its benchmark, line by line: omissions, prices out of line, lines the benchmark does not contain.
During early access - 04 · EstimateFaced with an estimate
Does the estimate hold up?
Your own, or one presented to you. Quostra establishes its benchmark without having seen it, then sets the two side by side, total against total, then package by package.
Later - 05 · SavingsThroughout the design stages
Where can savings be made?
Quostra varies the assumptions that weigh most (structure, façades, basement, heights) and prices each option, along with what it changes elsewhere in the project.
Later
Feasibility opens in January 2027.
Leave your email address: we will write to you on the day your access opens. The other functions arrive during early access.
It doesn't guess. It asks.
What happens on screen before the analysis arrives, on a sample project.
- 1Describe
A few sentences are enough.
Brief, storeys, structure, city, and the figure you want to put to the test. No drawings needed.
- 2Check
Every piece of information picked out, with its source.
Whatever you did not say is flagged as “default”. Your target is shown for comparison only: it plays no part in the calculation.
- 3Calculate
The building goes up, the benchmark follows.
The project is rebuilt level by level and the quantities are worked out package by package. Each answer narrows the range.
- 4Refine
An assumption changes, you see what it costs.
Twenty centimetres more ceiling height: partitions, painting, façades and concrete walls shift, one by one. A ratio per m² misses that.
AI understands, the engine calculates
Artificial intelligence interprets your request and reads your documents. No figure comes from it: the quantities and amounts come from the engine. Same file, same result.
A database covering the whole building process
More than 17,500 tasks across 29 packages. Quantities are derived from standard ratios, adjusted to the specifics of the project. Prices are based on real projects.
You stay in control
Quostra delivers an analysis; it does not decide. Every default value is flagged: you review it, you challenge it, you decide.
A variant in minutes, not in days.
A ceiling height, a construction method, one basement level fewer: you change the assumption, and Quostra reworks the quantities and the cost, item by item. You compare variants during the meeting, without waiting for a new cost estimate.
| What changes | 2.50 m | 2.70 m |
|---|---|---|
| Partitions | 1,700 m² | 1,840 m² |
| Wall painting | 4,300 m² | 4,640 m² |
| Façades | 1,030 m² | 1,100 m² |
| Concrete walls | 2,250 m² | 2,410 m² |
Yes or no, and why.
Not a fifty-page report. A result first, then the detail behind each point, if you ask for it.
Whether the figure holds
With what margin, and what a different choice would change.
What the project has not yet decided
Every question still unanswered, and how much it weighs in the amount.
What the analysis rests on
What you entered, what was calculated, what was assumed by default.
What is missing
The work the building requires and the document does not cover.
What is not in the benchmark
Lines Quostra did not expect. Points to check, and perhaps to optimise.
Prices out of line
Anything out of line with market values for this location.
Your files as they are: estimate, bids, project documents. In Excel or PDF, then in your country's own format. Nothing to re-enter, no template to follow.
An analysis report and an item-by-item estimate, with the source of every value. Both export to PDF and Excel.
Straight away
The analysis arrives while the decision is still open, not three weeks later.
With every version of the project
An assumption changes, you run it again. Nothing has to be redone.
With no stake in the project
Same file, same result. Quostra does not change its figure from one day to the next.
Across all your projects
The same yardstick on every scheme, from the first feasibility study to the last bid.
Whether you own the figure, or judge it.
Architects
You own the figurePresent a budget to the client already knowing the objections you will face, and what a different choice would change.
Designers and works directors (direttore dei lavori)
You own the figureGo out to tender with documents in which the decisions have been made, and spot those still outstanding.
Client's project managers
You judge the figureCheck an estimate or bids without redoing the cost plan, with a second figure that comes neither from the designer nor from the contractors.
Property developers
You judge the figureKnow before committing to the scheme whether it fits the cost envelope, and what your margin depends on.
From houses to hotels, from new build to conversion. Housing, offices, shops, hotels, healthcare, public-access buildings, car parks: Quostra rebuilds the building before giving its view, across seven markets.
Architect, designer, project manager or developer?
Early access is free of charge. Your email address is all it takes.
What is it?
Quostra analyses what your project costs, item by item, and sets it against the figure you have to meet: a budget, an estimate or bids. You see what holds, what needs checking, and the decisions that move the amount. The software does not draft any project documents: it analyses a figure.
When can I use it?
Access opens in January 2027, with the full Feasibility function. Completeness checks on a set of documents, then bid analysis, arrive during early access. You will receive an email on the day your access opens.
Is it free?
Yes. Early access is free of charge and carries no obligation, with no bank card. Pricing will be announced before early access ends, and nothing will be charged without your agreement.
How can a project be analysed without drawings?
You give what you already know: floor areas, storeys, construction principles. Decision trees work through the project package by package and ask you for whatever they lack. The more precise the description, the narrower the range.
How is it different from an AI assistant?
An assistant comments on the document you hand it. Quostra rebuilds the building and establishes its own figure from more than 17,500 tasks. AI understands your request and reads your documents, but the quantities and amounts come from the engine: the same file always gives the same result, and every piece of data shows its origin.
What happens to my documents?
You upload them as they are, in Excel or PDF, without redoing them in a template. The XPWE and SIX formats will follow. They are used solely to analyse your project and are never sold on. To read them, Quostra uses service providers bound by contract; the list, the retention period and your rights are set out in our privacy policy.
Does Quostra replace my cost consultant or my lead designer?
No. It provides a reasoned analysis, a benchmark established with the same method for every project, and makes no decision for anyone. Whoever leads the project reviews, challenges and decides. The analysis is not contractually binding.
Stop signing off a figure on trust.
Sign up now. Access opens in January 2027.