The type O classification
1 What type O covers
Type O covers hotels, guesthouses and collective accommodation establishments with sleeping accommodation for the public. What distinguishes the type is precisely the presence of sleeping accommodation: it is that characteristic which triggers the reinforced requirements, whatever the occupancy.
2 Categories by occupancy
| Category | Total occupancy, public and staff | Regime |
|---|---|---|
| 1st | Over 1,500 | Book II plus type O, articles O 1 to O 24 |
| 2nd | 701 to 1,500 | Book II plus type O, articles O 1 to O 24 |
| 3rd | 301 to 700 | Book II plus type O, articles O 1 to O 24 |
| 4th | Up to the fifth-category threshold | Book II plus type O, articles O 1 to O 24 |
| 5th | Below 100 members of the public | Book III, the simplified regime |
For type O the reference occupancy takes in the number of people accommodated overnight plus the staff simultaneously present. A hotel of 80 double rooms can exceed 160 guests, to which the night staff must be added.
3 The particular hotel articles
Articles O 1 to O 24 (first to fourth categories) and PO 1 to PO 13 (fifth category) of the regulation carry requirements specific to hotels. Notably, and exceptionally within the regulation, the PO articles include provisions applicable to existing hotels. That means an operator can be required to bring an existing hotel into compliance even without carrying out works.
Fire safety: reinforced requirements for sleeping accommodation
1 The general principle
Buildings open to the public with sleeping accommodation receive particular attention from the legislator: the occupants may be asleep when a fire starts, and therefore slower to react. That observation led to significantly reinforced requirements compared with an ordinary building of the same category.
2 The category A fire safety system
For any hotel with sleeping accommodation, including fifth-category establishments with bedrooms, a category A fire safety system is generally required. It is the most complete: it combines automatic fire detection covering the whole building with type 1 control equipment. The system allows early detection of a fire, automatic triggering of the evacuation alarm, and automatic safety operation of the installations, closing fire doors, starting the smoke control, stopping the ventilation.
| Component | Function | Type O requirement |
|---|---|---|
| Automatic detection | Detects smoke and combustion gases | Detectors in every bedroom, in the corridors and in the plant rooms |
| Type 1 control equipment | Centralises and commands the safety actions | Central panel with a standby supply |
| Type 1 alarm equipment | A modulated evacuation signal plus a voice message | Intelligibility guaranteed in the bedroom with the door closed |
| Actuators | Fire door closing, smoke control, ventilation shutdown | Centrally commanded from the control equipment |
| Emergency lighting | Escape route marking and safety lighting | Marking of routes and bedrooms |
3 Fire resistance and compartmentation
The construction separating sleeping accommodation from other rooms must have a fire resistance suited to the category. For the first four categories, floors are at least REI 60, rising to REI 120 for high-risk rooms; walls between bedrooms and escape corridors are EI 60; and bedroom doors are EI 30. Those doors are a crucial protection: in a fire they give occupants time to escape along the corridor to the stair.
4 Smoke control
Corridors serving sleeping accommodation must have smoke control. It may be natural, through façade openings operated manually or automatically, or mechanical, through dedicated ductwork. Enclosed stairs must also be smoke-controlled or held under pressure. For hotels in the first two categories, mechanical smoke control of the horizontal circulation is generally imposed.
5 Escape routes
The number and width of escape routes are calculated from the occupancy under the general articles. For sleeping accommodation the principal rule is that a protected stair must be reachable from any point of the circulation within 40 m, with dead ends limited to 10 m. Escape stairs must be distinct from private stairs and reachable from the corridors without passing through a high-risk room.
Frequent design traps A dead-end corridor exceeding 10 m with no escape route is non-compliant. Detection omitted from store rooms, luggage rooms or the linen room is insufficient. An EI 30 bedroom door without a self-closer is non-compliant: the door must close by itself. Control equipment without a standby supply is non-compliant. Detection installed but not connected to the control equipment is not a lawful installation.
Accessibility in hotels
1 General principles
As a building open to the public, a new hotel must be fully accessible to disabled people, whatever the disability, mobility, sight, hearing, cognitive. That obligation covers the common parts, the facilities and a proportion of the bedrooms.
2 Accessible bedrooms
The quota of adapted bedrooms is set by the order of 20 April 2017 for new public buildings (art. 17): one room up to 20 rooms, two up to 50, then one more per further 50 rooms, spread across the levels served by a lift. An accessible room must allow a wheelchair to manoeuvre, with a 150 cm turning space beside the bed, include an accessible bathroom with a level-access shower tray, grab rail and folding shower seat, and carry adapted signalling such as a visual alarm for people with hearing loss.
| Hotel zone | Accessibility requirement | Key regulatory measurements |
|---|---|---|
| Principal entrance | Level entry or a ramp at or below 5 % | At least 0.90 m wide, no threshold above 2 cm |
| Hall and reception | A clear route 150 cm in diameter | Part of the counter accessible at or below 0.80 m |
| Lift, above ground floor | Mandatory from 50 people on upper floors, or where a service is missing at ground level | Door at least 0.80 m, car at least 100 × 140 cm |
| Corridors | At least 1.40 m | 1.20 m at isolated points |
| Accessible bedroom | A 150 cm turning space beside the bed | Fixed bed 0.40–0.50 m high, sockets at an accessible height |
| Accessible bathroom | Level-access shower plus grab rails | Folding seat, L and U rails, a 150 cm turning space |
| Parking | At least 2 % accessible spaces | At least 3.30 m wide, with signage and an unloading route |
3 Hotels in existing buildings
For a hotel refurbished within an existing building, the prefect may grant derogations from the accessibility rules for technical impossibility, for heritage conservation constraints or where the improvements are manifestly out of proportion to their cost (CCH, art. R164-3). The justified application is sent to the prefect in three copies; the prefect decides after the opinion of the departmental commission, and silence counts as approval for third, fourth and fifth-category establishments (art. R122-18).
The safety commission: mandatory visits
1 The opinion before opening
Every hotel in the first four categories must obtain a favourable opinion from the competent safety commission before opening to the public. That visit takes place after the works are finished and before the first guest arrives. The operator must request it at least a month before the intended opening. An unfavourable opinion prohibits opening.
2 Periodic visits
Hotels in the first four categories are visited every three years. Fifth-category hotels with sleeping accommodation are visited every five years (article PE 37), a frequency the mayor or the prefect may increase.
3 The opinion on the planning application
For hotels in the first four categories the safety commission must be consulted when the planning application is filed. Its opinion, which is advisory, addresses the scheme's compliance with the regulation. Where it is unfavourable the client may modify the scheme. The planning permission stands as the authorisation required for a building open to the public once the competent administrative authority has agreed, and that authority may set operating requirements (planning code, L425-3).
The environmental regulations applied to new hotels
The environmental regulations apply to the construction of new hotels whose planning application has been filed since 1 May 2026, the date on which the decree of 15 January 2026 extended their scope beyond housing and standard commercial buildings. Hotels are named in the list in article R172-1 of the CCH; their thresholds, for the night and day parts and by number of stars, are set in the annex to article R172-4.
What to know Hotel use is treated separately from housing and offices in the calculation, with different occupancy scenarios and a high demand for domestic hot water. Heat pumps are favoured for hot water and heating, with an advantageous energy coefficient. The construction carbon indicator applies: reinforced concrete structures must justify their footprint through the life-cycle assessment. Hotels carry the same certificate obligations at application and completion as other buildings, with no large-area threshold; the text excludes in particular constructions or extensions below 50 m², and extensions below 150 m² and below 30 % of the existing floor area (CCH, R172-1, III). Light leisure dwellings have been subject to the regulations since 1 July 2023 (R172-1, II).
Hotel star rating and regulation: how they interact
The hotel star rating, awarded by the national tourism body, is distinct from fire safety and accessibility regulation. There is no direct correlation between the number of stars and the regulatory category. A five-star palace can sit in the fourth category if its total occupancy is below 300, while a two-star hotel offering conferences can fall in the second.
Certain facilities required by the star rating, spa, indoor pool, conference room above 300 people, can, however, bring the establishment into additional regulatory types, each with its own requirements: covered pools and conference halls have their own regimes.
Planning: specific consents
Building a hotel requires standard planning permission with a public-building file: the safety statement, the accessibility certificate, the smoke control drawings. The determination period is five months, against three for other buildings, with no further extension in a heritage perimeter.
Converting an existing building into a hotel requires planning permission or, in some cases, a prior declaration according to the scale of the works. Moving from residential to hotel use is a change of use under the planning code, subject to permission or declaration according to the structural works involved.
The economic impact on the estimate
Estimating a new hotel or a hotel refurbishment must build in the regulatory premiums from the brief. These costs are often under-estimated in initial feasibility studies, notably the category A fire safety system and the accessibility adaptations.
| Regulatory item | Effect on cost | Notes |
|---|---|---|
| Complete category A fire safety system | 60,000 – 180,000 € excl. VAT according to area | Excluding low-voltage cabling and containment |
| EI 30 doors with self-closers | 500 – 900 € per door installed | According to finish, timber or metal, with frame |
| Mechanical corridor smoke control | 15,000 – 50,000 € excl. VAT | According to the number of levels and duct runs |
| Emergency lighting | 80 – 150 € per unit installed | Requires annual testing and battery replacement |
| Accessible bedroom, premium over standard | 2,000 – 6,000 € excl. VAT per room | Level-access shower, rails, adjustable wall-hung WC |
| Accessible lift, where required | 30,000 – 80,000 € excl. VAT | According to speed, load and number of stops |
| Environmental certificates, application and completion | 3,500 – 8,000 € excl. VAT | Thermal engineer plus the completion certifier |
| Safety commission and safety file | 2,500 – 5,000 € excl. VAT | Technical control office or architect fees |
Summary for the economist Shell construction budget for a new budget hotel: 1,800 – 2,800 € excl. VAT per m² of floor area according to standing. For a high-end hotel: 3,000 – 5,000 €/m². The category A fire safety system is a critical item to price from the concept stage, at 60–180 k€. EI 30 doors: roughly one per room plus the fire doors to landings, stairs and plant rooms. Accessibility: allow at least one accessible room plus the quota by size, at a premium of 2,000–6,000 € per room. On the environmental regulations, a thermal engineer is mandatory from the planning application, and the materials assessment should not be neglected. Determination period: five months, plus the safety commission opinion before opening.
Links to the related articles in this cocoon
General public-building regulation, types, categories, safety commission, is developed in its own article. Fire safety, fire resistance and the fire safety systems are covered in the fire article. Accessibility obligations zone by zone are treated in the accessibility article. For new hotels under the environmental regulations, that article details the indicators and thresholds. The planning article explains the determination periods specific to buildings open to the public and the change of use procedure.
The nature of the figures quoted
The percentages and amounts quoted on this page are orders of magnitude for framing, not measurements. They illustrate mechanisms and proportions, and they substitute neither for a tender exercise nor for an estimate prepared on drawings.
Sources: the order of 25 June 1980 as amended, including articles O 1 to O 24 and PO 1 to PO 13; the accessibility order of 20 April 2017 for new public buildings; the construction and housing code; and the environmental regulations decree of 29 July 2021.