Buildings open to the public: classification, categories and compliance 2026

📐 Topic

By , construction economist

Information verified on 15 min read

  1. Two levels of classification: activity type and category by occupancy
  1. The safety regulation: a structure in four books
  1. The construction articles that matter at design stage
  1. The lighter regime for fifth-category buildings
  1. The safety commission: an indispensable opinion before opening
  1. The safety file and the technical documents of the planning application
  1. The economic impact for the construction economist
  1. Links to the other articles in this cocoon

The regulation of buildings open to the public is one of the most demanding bodies of rules in French construction. It covers almost every non-residential operation: shops, hotels, restaurants, offices open to the public, educational establishments, sports facilities, healthcare buildings. For the construction economist, commanding these rules is indispensable: they govern structural choices, expensive technical equipment and specific administrative timescales that bear directly on the budget and the programme.

Two levels of classification: activity type and category by occupancy

Every such building is first defined by its activity type, given a letter, then by its category, from first to fifth, according to the occupancy admitted. Those two parameters determine the whole body of safety rules that applies. Confusing the two levels is a frequent error: the type fixes how occupancy is calculated and the particular provisions, while the category determines the general regulatory corpus, the second book for the first four categories, the third book for the fifth.

1 Activity types and the fifth-category thresholds

The general regulation distinguishes two sets: the ordinary types, subject to the first three books, and the so-called special types with partly self-standing regulations. The table gives the types most commonly encountered, with the maximum occupancies allowing a building to stay in the fifth category and therefore benefit from the lighter regime.

Type Activity Basement Upper floors Total Sleeping accommodation
J Older or disabled people n/a n/a 100 Yes
L Conferences, meetings (performances: 20 in basement, 50 in total) 100 n/a 200 No
M Shops and shopping centres 100 100 200 No
N Restaurants and bars 100 200 200 No
O Hotels and guesthouses n/a n/a 100 Yes
R Education, training, holiday centres 100 100 200 Yes if boarding
S Libraries and documentation centres 100 100 200 No
U Healthcare without accommodation n/a n/a 100 No
U Healthcare with accommodation n/a n/a 20 Yes
W Administration, banks, offices 100 100 200 No
X Covered sports facilities 100 100 200 No
Y Museums 100 100 200 No

Table 1. Common types and the maximum fifth-category occupancies. Below these thresholds the simplified regime applies.

Special types with self-standing regulations • Mountain hotels and restaurants • Covered car parks: compartments up to 3,000 m², smoke extraction at 900 m³/h per vehicle, REI 90 separation from third parties • Publicly accessible railway stations • Marquees and temporary structures. These types are not subject to the second book of the general regulation but to their own sector texts.

2 The five categories and their regulatory corpus

The occupancy used for classification is the sum of public and staff, except in the fifth category where only the public counts. Calculating the public occupancy follows methods specific to each type, number of seats, sales area open to the public, the operator's declaration, set out in each particular regulation.

Category Occupancy Group Applicable corpus
1st Over 1,500 people 1st group Books I and II plus the particular regulations
2nd 701 to 1,500 1st group Books I and II plus the particular regulations
3rd 301 to 700 1st group Books I and II plus the particular regulations
4th The fifth-category threshold to 300 1st group Books I and II plus the particular regulations
5th Below the threshold for the type 2nd group Books I and III, the simplified articles

Table 2. Categories and regulatory corpus.

The safety regulation: a structure in four books

The safety regulation consists of the order of 25 June 1980 as amended, completed by numerous thematic orders and technical instructions. Its structure in four books answers a logic of differentiated application by size and activity.

Book I gathers the general articles applicable to every such building without distinction. The first defines the types. One article is critical for work in existing buildings: only the parts modified must be brought into compliance, which means the scope of the works must be precisely defined in the planning application.

Book II is the heart of the regulation for the first four categories. It divides into general provisions structured by theme, general matters, construction, materials, smoke control, heating, electricity, lighting, lifts, means of rescue, and particular regulations for each activity. Those particular regulations complete and adapt the general provisions: the obligations of a first-category hotel differ appreciably from those of a shop of the same category.

Book III governs fifth-category buildings under a simplified regime, with separate articles for hotels and for healthcare. The economist should note that structural requirements there are markedly reduced, no fire resistance requirement where the floor of the highest level sits at most 8 m above the fire service access level, except in establishments with sleeping accommodation.

Book IV covers special establishments with their own regime. Among them, covered car parks are very common in mixed operations and deserve particular attention in design and estimating.

The construction articles that matter at design stage

The construction articles of Book II are the most structuring for architect and economist. They define siting constraints, escape routes, fire resistance, travel distances and the rules on fire spread.

1 Fire service access

Any such building whose lowest floor of the highest level open to the public sits more than 8 metres above ground must be served by ladder access routes at least 4 m wide. Below 8 metres, the building is served by an appliance route, 8 m wide with a carriageway of at least 3 m, or by an open space. Ladder access points are no more than 20 metres apart, and on a blank façade or one with fixed lights, accessible openings are spaced 10 to 20 metres apart.

The regulation fixes the number of façades accessible to the fire service: two to four in the first category according to occupancy and the layout of the rooms, one for the second, third and fourth. For a first-category building in a dense urban setting, that constraint can force a set-back, the removal of on-street parking or expensive architectural solutions.

2 Fire resistance of structure and floors

The regulation fixes the fire resistance of load-bearing elements and floors according to the category and height of the building. The higher the category and the taller the building, the more severe the requirements. The table in CO 12 sets no specific rating for basement floors: it takes account of the height of the lowest floor of the top level and of the difference in height between the extreme levels of the establishment, and runs from half an hour for structure and floors in a single-storey building to an hour and a half in the most demanding band of the first category. The roof can be exempted if it is inaccessible to the public, built of non-combustible material or timber, and its structure left exposed.

3 Escape widths and travel distances

The regulation defines the unit of passage: one unit is 0.90 m, two units 1.40 m, three units 1.80 m, and beyond that each unit adds 0.60 m. Calculating the number of units required adds the occupancies of every room served by the same route towards the exit.

Maximum travel distances are 40 metres from any point in a room to a protected stair, enclosed or in the open air, and 30 metres to an unprotected stair or in a dead end. These distances directly govern where the vertical circulation cores sit on the plan.

4 The rule on vertical fire spread

This rule aims to prevent fire spreading from one floor to the next by way of the façade. It measures the height of solid construction between the head of one opening and the sill of the opening above, plus the depth of the floor between the two levels. The sum must reach at least 1 metre, or 1.30 metres where the combustible mass of the façade exceeds 130 MJ/m². It applies to the façades of buildings with sleeping accommodation above the first floor, notably hotels, to buildings whose top level exceeds 8 metres and which are divided into sectors or compartments, and to the parts of a façade in line with the ceilings of high-risk rooms or of floors separating the building from a third party.

A rule to anticipate at outline stage It can make a continuous glazed façade incompatible with a hotel or care programme. It often imposes solid spandrels of significant height, concrete upstands, parapets or solid bands. An exemption is possible where the building is wholly occupied by the establishment and fully sprinklered or fitted with a category A fire safety system.

5 High-risk rooms

Every room is classified as ordinary risk or particular risk, medium or high. Medium risk covers kitchens above 20 kW, stores and linen rooms. High risk covers boiler rooms above 70 kW, high-voltage substations, refuse chutes and gas storage. Medium-risk rooms must be separated to REI 60, high-risk rooms to REI 120. The precise list varies with the type; refer to the particular regulation.

6 Protected waiting areas for people with reduced mobility

The regulation requires refuge areas for people with reduced mobility. The most widespread solution is to widen the landings of protected stairs to create a space inaccessible to smoke and fire while waiting for the fire service. These requirements are frequently forgotten at design stage and can force a revision of the stair drawings if not anticipated early.

Fifth-category buildings: the lighter regime

Fifth-category buildings, by far the most numerous in France, benefit from a markedly simplified regime. The economist should note that it allows standard construction with no specific structural constraint where the floor of the highest level stays at most 8 metres above the fire service access level, except in establishments with sleeping accommodation.

Article Subject Principal rule
Scope Application A table of thresholds by activity type
Fire resistance Structure One hour if the floor of the top level is above 8 m; no requirement otherwise
Separation from third parties Party construction One hour for party walls and floors
Maximum depth Basements A single basement level open to the public, its lowest point no more than 6 m below the average level of the external thresholds (CO 40)
High-risk rooms Separation One hour mandatory: substations, archives, gas, refuse
Escape Routes A defined direction of escape above 50 people; the same width calculation
Smoke control Ventilation Above 300 m² at ground or upper level, or 100 m² in a basement
Alarm Warning system An alarm audible from every point, equipment chosen by the operator
Sleeping accommodation Reinforced regime A category A fire safety system mandatory plus reinforced fire-resisting partitions

Table 3. The essential articles for fifth-category buildings.

Fifth category with sleeping accommodation: a reinforced regime Hotels and social care establishments of the fifth category with bedrooms carry markedly heavier obligations: • a category A fire safety system, with full detection and control • bedroom partitions fire-resisting to at least half an hour • finishes at sleeping levels: walls to B-s1,d0 and ceilings to A2-s1,d0 • the hotel articles exceptionally include provisions applicable to existing hotels. Estimated fire safety premium: 5–8 % of the works budget.

The safety commission: an indispensable opinion before opening

The safety commission is the body that checks fire compliance. It is consulted at two distinct moments: during determination of the planning application, giving an opinion on the scheme, and at completion, giving the opinion that allows operation. An unfavourable opinion at completion is decisive: no opening to the public is possible without a favourable one.

For buildings in the first four categories, and for fifth-category buildings with sleeping accommodation, the commission is systematically consulted. For fifth-category buildings without sleeping accommodation it is called only at the mayor's request or in particular circumstances.

Composition and working of the commission It is generally a joint fire safety and accessibility commission. It includes a representative of the prefecture, a fire service officer, a representative of the municipality and, on some projects, the police. For the first four categories, technical control is mandatory and covers both the soundness of the structure and the safety of people. The completion visit should be planned three months before the intended opening to allow for any recalibration.

The opening visit must be anticipated in the construction programme. A premature visit, before every fire safety installation is operational, smoke control tests, actuator tests, alarm tests, ends in a deferred opinion. That delay can push the opening back several weeks, with significant financial consequences for the operator.

The safety file and the technical documents of the planning application

The regulation defines the safety file attached to the application for planning permission or works consent for a building open to the public. The file is required for every such building except, since 21 November 2025, fifth-category buildings without accommodation, which no longer need a consent on fire safety grounds. Where the project includes particular provisions, atypical smoke control, an alternative solution to a regulatory provision, an overhaul of the fire safety system in an existing building, it includes a sheet for each derogation, with its justification and the compensating measures proposed, examined by the commission before work starts. It avoids an unfavourable opinion at completion on provisions that should have been reconsidered earlier.

Mandatory technical documents for a first- to fourth-category building • A fire safety statement: type and category classification, fire resistance, compartmentation, escape routes, smoke control, the fire safety system, means of rescue • An accessibility file: dimensioned drawings of the routes and circulation, and a statement • Drawings of the fire safety installations: schematic and detection zones • Smoke control drawings: reservoirs, vents, air inlets • The technical controller's report on structural soundness and the safety of people and, where applicable, on accessibility • The safety file, with a sheet for each derogation where applicable • The environmental regulations compliance certificate, according to building type

The economic impact for the construction economist

The regulation generates specific premiums the economist must price from the outline stage, on pain of significant overruns later. They are structured in several cumulative items.

1 Structure and fire resistance

Requirements on the fire resistance of structure, from R 30 to R 90 according to category and height, can force larger steel sections, fire protection to steel frames through plasterboard or sprayed coatings, or thicker concrete columns. The estimated premium on the structural package is 5 to 15 % according to category and building type.

2 Compartmentation

Fire-resisting partitions, fire doors, fire-resisting access panels in risers and fire dampers in ductwork represent a further 5 to 20 € excluding VAT per square metre of usable floor according to the density of the brief. Self-closing fire doors add 800 to 1,500 € each and can multiply maintenance problems in operation.

3 A category A fire safety system

A category A system represents 30,000 to 200,000 € excluding VAT according to area and the number of detection zones. It covers detection, the control equipment, the actuators, dampers, powered doors, the safety power supplies and the alarm sounders. The coordinator role, to be allowed for with a category A or B system, adds 5,000 to 20,000 € of fees.

4 Smoke control

Mechanical smoke control, often chosen for windowless rooms, basements and large volumes, represents 15,000 to 80,000 € excluding VAT according to area. Naturally ventilated rooms are markedly cheaper but require roof vents or façade openings respecting the siting rule: the maximum distance between the smoke outlet and any point of the room must not exceed four times the ceiling height, or 30 metres.

5 Fire service routes and technical control

Creating or laying out appliance and ladder routes represents 80 to 150 € excluding VAT per square metre of dedicated roadway. Technical control, covering soundness, the safety of people and, where applicable, accessibility, represents 0.3 to 0.8 % of the works cost.

Summary for the economist: first- to fourth-category buildings • Structure, for fire resistance: +5–15 % on the structural package • Compartmentation, partitions, doors and dampers: 5–20 € excl. VAT per m² of floor • Category A fire safety system: 30–200 k€ excl. VAT, excluding the coordinator • Fire safety coordinator: 5–20 k€ of fees • Mechanical smoke control: 15–80 k€ according to volume • Fire service routes, where created: 80–150 € excl. VAT per m² • Technical control covering soundness, the safety of people and accessibility where applicable: 0.3–0.8 % of the works • Anticipate the safety commission three months before the intended opening

Links to the other articles in this cocoon

To go further on building regulation → Construction regulations in France: the overview and general framework → Accessibility in construction: obligations and measures → Fire safety and fire resistance → Planning permission: procedures, timescales and challenges → The environmental regulations: obligations and their effect on the works → Hotel regulation and sleeping accommodation: the complete guide.

The nature of the figures quoted

The percentages and amounts quoted on this page are orders of magnitude for framing, not measurements. They illustrate mechanisms and proportions, and they substitute neither for a tender exercise nor for an estimate prepared on drawings.

Sources: the BT construction cost indices published monthly by INSEE on its 2010 base, used to update the figures · construction cost statistics from SDES, the statistical service of the ministry responsible for construction · regulatory texts published in the Journal officiel and consolidated on Légifrance for the requirements cited.

← Construction regulations in France: the complete guide 2026