  1. The type M classification and occupancy calculation
  1. Planning and the retail consent
  1. Fire safety in a type M establishment
  1. Accessibility in a shop
  1. Food retail: specific regulation
  1. The economic impact for the construction economist
  1. Links to the other articles in this cocoon

Shops and shopping centres form type M of the public-building regulation, one of the most complex in terms of potential occupancy and spatial configuration. A department store can receive several thousand people over several levels, with specific risks tied to foodstuffs, to flammable products in hardware and household goods, and to basement storage. The construction economist must command the category thresholds, the safety obligations and the fit-out costs specific to retail.

The type M classification and occupancy calculation

Type M covers every retail shop, including shopping centres, malls, supermarkets and covered markets. Occupancy is calculated on the sales area: one person per 3 m² in the basement, on the ground floor and on the first floor, one per 6 m² on the second floor and one per 15 m² on higher floors (article M 2). Storage areas not open to the public do not count.

Category Total occupancy Applicable corpus Commission opinion before opening
1st Over 1,500 Book II plus type M Mandatory
2nd 701 – 1,500 Book II plus type M Mandatory
3rd 301 – 700 Book II plus type M Mandatory
4th The threshold to 300 Book II plus type M Mandatory
5th Below 200 (100 in a basement or on upper floors) Book III, the simplified regime Not required

The fifth-category threshold for type M Public occupancy below 200 in total, below 100 in a basement and below 100 on upper floors (article PE 2), that is less than 600 m² of sales area at one person per 3 m². Basement storage alone is possible where access is restricted to staff and the separation achieves EI 60.

Planning and the retail consent

Any new shop above 20 m² requires planning permission; an extension requires a prior declaration up to 20 m², or 40 m² in an urban zone of a local plan provided the total floor area does not exceed 150 m². Shops above 1,000 m² of sales area, food or non-food, require a retail operating consent, after an opinion from the departmental retail planning commission. The commission gives its opinion during the determination of the planning application, which then takes five months.

The retail operating consent Threshold: a shop above 1,000 m² of sales area, or an extension taking it above 1,000 m². Determination: two months for the commission's decision. An appeal to the national commission adds four months. The criteria examined are urban integration, the effect on the existing retail fabric and the environmental footprint. Note that where the project requires planning permission, the permission stands in for the retail consent once the commission has given a favourable opinion (planning code, art. L425-4).

Fire safety in a type M establishment

1 General provisions

The provisions particular to type M complete the general articles. The principal requirements bear on smoke control of large floorplates, often through roof vents; the fire safety system, category B in the first category, C, D or E in the second, A on the commission's opinion; means of rescue, hose reels every 25 m, one extinguisher per 200 m²; and the roof structure, in double-skin steel deck or fire-retardant treated timber.

2 Escape routes

The calculation follows the general rule: one unit of passage per 100 people. A shop for 600 people, in the third category, must have three exits totalling at least six units, that is 3.60 m of cumulative width. Emergency exits open in the direction of escape, with panic hardware, and discharge directly onto the public highway or into a protected route to the outside. Emergency exits may not sit more than 40 m from a protected stair or a direct exit.

Configuration Smoke control Detection Sprinklers
Shop, 1st–2nd category Vents plus extraction Category B system (1st), C to E (2nd) Mandatory above 3,000 m² of sales area
Shop, 3rd category Vents to the standard Not required by M 30 Mandatory above 3,000 m² of sales area
Shop, 4th category Natural vents Alarm equipment (art. M 32) Not mandatory
Shop, 5th category Natural openings A basic alarm Not mandatory
Shopping centre An overall smoke control system Category A fire safety system Mandatory under the special regulation

Accessibility in a shop

A shop in categories one to four must be fully accessible. In new construction, fifth-category shops must also be accessible (CCH, art. R162-9, order of 20 April 2017). The principal points of attention are access to the till, the aisles between shelving and the fitting rooms.

Accessibility checklist at design stage → Entrance: threshold at or below 2 cm, door at least 0.90 m, a reception point at or below 0.80 m. → Principal aisles between shelving: at least 1.40 m; secondary aisles at least 0.90 m. → Accessible tills: at least one per 20 with a counter lowered to 0.80 m and a knee space. → Accessible fitting room: at least one measuring 1.50 m × 1.30 m with a grab rail. → Lift or ramp: on multiple levels, accessible service is mandatory to every level open to the public.

Food retail: specific regulation

Food retail, supermarkets, grocers, butchers, cheesemongers, is additionally subject to public health regulation: washable surfaces, separated clean and dirty flows, maintenance of the cold chain with a delivery room at or below 8 °C, a dedicated unloading dock. These requirements do not fall under the fire regulation but govern the design of the plant rooms, the docks and the refrigerated stores.

Food retail with a preparation area, delicatessen, butchery with cutting, bakery, is additionally subject to the European food hygiene regulation. The preparation space, treated as a professional kitchen, can be classified a medium-risk room where the heat is significant, as with a bakery oven. The extraction canopy and the fat storage rooms are then subject to the rules for large kitchens (the GC articles of the regulation, notably GC 9 and GC 10).

The economic impact for the construction economist

Item Indicative ratio Notes
Shell and core, structure and envelope 610 – 1,020 €/m² of floor area Concrete or steel frame
Internal retail fit-out 410 – 920 €/m² Shelving, floors, partitions, electrical installation
Heating and cooling 60 – 150 €/m² Split systems or a central air handling unit
Smoke control, vents and extraction 20,000 – 80,000 € According to area and number of vents
Fire safety system and detection 30,000 – 100,000 € According to area and category
Accessibility works 3 – 8 % of the fit-out package Accessible till, fitting rooms, aisles
Retail consent above 1,000 m² Planning determination extended to five months Plus the risk of a national appeal
Safety file and commission 3,000 – 10,000 € Fire engineer plus coordination

Summary for the economist Construction cost of a standard shop, excluding land, external works and catering equipment: 1,020 – 2,240 €/m² of floor area. A shopping centre: 1,530 – 3,060 €/m² according to standing, excluding tenant works. Above 1,000 m² of sales area, allow a budget of 10,000 to 30,000 € for the retail consent study and a planning determination extended to five months. Food retail: a refrigerated delivery dock and staff sanitary accommodation must be in the brief. Structural warranty insurance is mandatory for the client, except public bodies and large companies building for a use other than housing (insurance code, art. L242-1).

Links to the other articles in this cocoon

General public-building regulation, classification, commission, safety file, is developed in its own article. The restaurant article covers type N, often associated with ground-floor retail or retail parks. Accessibility is treated in detail in the accessibility article. The mixed-use article covers buildings where shops occupy the ground floor.

Sources: the order of 25 June 1980 as amended for type M, the order of 20 April 2017 on accessibility in new buildings open to the public, the order of 8 December 2014, the retail planning legislation and its decrees, the European food hygiene regulation, and the commercial code.

Reference basis of the figures

These bands are orders of magnitude for framing. Unless the page names another area, their reference market is standard provincial France, outside the major cities (regional cost factor 1.00). They serve to place a budget at the earliest stages and to compare building types with one another. They replace neither a tender exercise nor an estimate prepared on drawings, and they are not a record of prices actually charged.

The ratios per square metre and per item on this page are stated in January 2026 values. They were updated from January 2025 values, the basis adopted for the whole cocoon, using the BT01 all-trades index published monthly by INSEE on its 2010 base: 132.0 in January 2025, 134.7 in January 2026, a rise of about 2 %.

The global amounts quoted as examples, and any rents, charges or receipts expressed per year or per night, remain on their own basis: a building cost index does not apply to them.

To bring the ratios forward, apply the usual revision formula: updated value = page value × (BT01 for the month in question / 134.7). The index has kept rising since: it stood at 139.4 in August 2026, the last value published when this page was checked (Journal officiel of 16 October 2026), that is 3.5 % above the reference base. BT01 measures contractors' input costs, wages and social charges, materials, plant and energy, not the prices actually tendered.

← Construction regulations in France: the complete guide 2026