The type N classification and occupancy calculation
Type N covers restaurants, cafés, brasseries, station buffets, nightclubs serving meals, and licensed premises for consumption on the spot. The public occupancy is calculated under article N 2: for seated dining, the number of places declared, within a limit of one person per 2 m² (failing that, one per m²); two people per m² for standing dining and three per m² in queues. The professional kitchen does not count in the public occupancy.
| Category | Total public occupancy | Regulatory corpus | Safety commission |
|---|---|---|---|
| 1st | Over 1,500 | Books I and II plus type N | Mandatory at application and opening |
| 2nd | 701 to 1,500 | Books I and II plus type N | Mandatory at application and opening |
| 3rd | 301 to 700 | Books I and II plus type N | Mandatory at application and opening |
| 4th | The fifth-category threshold to 300 | Books I and II plus type N | Mandatory before opening |
| 5th | Below 200 (100 in a basement) | Book III, the simplified regime | Not required before opening |
The fifth-category threshold for type N Public occupancy below 200 in total, below 100 in a basement and below 200 on upper floors (article PE 2). An uncovered terrace does not count in the occupancy.
Planning and permission for a restaurant
A restaurant above 40 m² of floor area, or one whose works exceed 20 m² in an existing unit, requires planning permission or a prior declaration according to the scale of the alterations. Converting a retail unit into a restaurant, with kitchen and extraction works, is a change of use in planning terms, subject to a prior declaration or permission according to the local plan. For buildings in the first four categories the application includes a safety file submitted to the commission.
Planning traps Kitchen extraction, with a duct through the roof, alters the external appearance and therefore requires a prior declaration, and may be refused in a heritage area. A change of use from offices to restaurant requires permission with a complete safety file. A covered or enclosed terrace constitutes additional floor area, requiring a declaration or permission. Some local plan zones prohibit restaurants outright or impose reinforced acoustic requirements.
Fire safety in a type N establishment
The regulation contains general provisions applicable to every building open to the public, and provisions particular to type N. Restaurants carry specific risks tied to the professional kitchen, flames, oils, gas, and to the density of the public in the dining room.
1 Escape routes
The calculation rests on the general rule: one unit of passage, 0.60 m, per 100 people. A restaurant for 200 people needs two exits totalling three units, for example one of 1.40 m (two units) and one of 0.90 m (one unit), the number of units being increased by one below 501 people. Exits may not sit in a dead end more than 30 m from the nearest way out. Protected stairs are required in basements and as soon as the establishment occupies an upper floor.
2 The professional kitchen: fire requirements
A large kitchen separated from the areas open to the public is classified a medium-risk room (article GC 9). It is separated from the dining room by walls and a ceiling fire-separating to one hour, with a door set fire-separating to 30 minutes fitted with a self-closer (integrity-rated to 30 minutes accepted for swing doors). The cooking installation is protected by an automatic extinguishing system, powder or water, beneath the extraction canopy. Under article CO 28, high-risk rooms, gas cylinder stores, spirit stores above 150 litres, must be enclosed by walls and a ceiling fire-separating to two hours, with doors fire-separating to one hour fitted with a self-closer.
| Space | Classification | Separating construction | Door |
|---|---|---|---|
| Dining room | Ordinary | n/a | Exit to the street |
| Professional kitchen | Medium risk | EI 60 to the dining room (REI 60 if load-bearing) | EI 30, self-closing |
| Spirit store above 150 litres | High risk | EI 120 (REI 120 if load-bearing) | EI 60, self-closing |
| Gas cylinder store | High risk | EI 120 (REI 120 if load-bearing) | EI 60 with low-level ventilation |
| Cold store | Ordinary | EI 30 above 300 kW of refrigerant capacity | EI 30 recommended |
Accessibility in a restaurant
A restaurant in the first four categories must be fully accessible. In new construction a fifth-category restaurant must also be accessible (CCH, art. R162-8 and R162-9, order of 20 April 2017). In practice the whole dining room, the sanitary accommodation, the cloakrooms and the covered terraces must be accessible. A service or fast-food counter must include at least one accessible position at or below 0.80 m with a knee space 0.30 m deep.
Accessibility checklist at design stage → Entrance: a ramp at or below 5 %, door width at least 0.90 m giving 0.83 m clear. → Aisles between tables: at least 0.90 m wide, with 1.50 m turning spaces every 10 m. → Accessible places: at least two up to 50 places, then one per further 50 places, which may be cleared when the person arrives (order of 20 April 2017, art. 16); tables with a clear space beneath at least 0.70 m high. → Accessible sanitary accommodation: one accessible WC per sex per level open to the public. → An L-shaped counter with one section at 0.80 m where service is at the counter.
The professional kitchen: specific regulation
A restaurant kitchen is subject to the departmental public health rules and to the European hygiene package, which require washable materials, a food safety management plan and separated clean and dirty flows. These requirements do not fall under planning permission but strongly govern the design choices and the areas allocated.
The ventilation of an enclosed large kitchen, above 20 kW of total useful power of the cooking and reheating appliances, falls under article GC 10 of the fire safety regulation for buildings open to the public: air supply, and extraction of stale air, steam and grease through hoods fitted with grease-retaining elements and through rigid metal ducts, whose passage outside the kitchen is fire-rated at least as highly as the walls crossed, with a minimum of 60 minutes; the gas code of practice covers gas installations in dwellings. In practice the extraction rate is sized on the power installed on the cooking positions, commonly 30 to 40 m³/h per kilowatt. A medium restaurant kitchen with 8 to 12 kW installed needs extraction of 300 to 500 m³/h with fresh air compensation. Extracted air is in principle discharged at least 8 m from any window or fresh-air intake, unless an arrangement prevents polluted air being drawn back in (departmental health regulation).
The economic impact for the construction economist
| Item | Indicative ratio | Notes |
|---|---|---|
| Structure and finishing trades, dining room | 820 – 1,430 €/m² of floor area | According to standing and materials |
| Fitted professional kitchen | 2,040 – 4,080 €/m² | Catering equipment supplied and installed |
| Kitchen extraction ventilation | 15,000 – 40,000 € | Fire-protected duct plus fan unit |
| Gas installation, where the kitchen is gas | 5,000 – 15,000 € | According to capacity and distance from the supply |
| Accessibility works | 5 – 15 % of the fit-out package | Ramp, accessible WC, adapted tables |
| Safety file and commission | 3,000 – 8,000 € | Fire engineer plus coordination |
| Automatic extinguishing under the canopy | 8,000 – 20,000 € | According to the cooking area |
| Acoustics, façade insulation | 5,000 – 20,000 € | Where there are residential neighbours |
Summary for the economist Overall turnkey restaurant construction cost, excluding land: 1,530 – 3,570 €/m² of floor area according to standing. The kitchen often represents 25 to 40 % of the total works budget. For the first four categories, allow for the safety commission, the safety file and coordination with the fire engineer. On acoustics, below new dwellings, the order of 30 June 1999 requires an insulation DnT,A of at least 58 dB between a business unit and the dwellings' main rooms. For kitchen extraction in a heritage area, consult the heritage architect from the sketch stage, since the duct will be visible on the roof.
Links to the other articles in this cocoon
The full public-building regulation, classification, categories, safety commission, is developed in its own article. Detailed accessibility standards are treated in the accessibility article. The retail article covers type M shops, which share many constraints with ground-floor restaurants. The mixed-use article covers buildings combining housing and shops, where ground-floor restaurants are frequent.
Sources: the order of 25 June 1980 as amended for type N, the order of 20 April 2017 on accessibility in new buildings open to the public, the order of 8 December 2014, the European food hygiene regulation, the GC articles of the fire safety regulation on large kitchens and the departmental health regulation.
Reference basis of the figures
These bands are orders of magnitude for framing. Unless the page names another area, their reference market is standard provincial France, outside the major cities (regional cost factor 1.00). They serve to place a budget at the earliest stages and to compare building types with one another. They replace neither a tender exercise nor an estimate prepared on drawings, and they are not a record of prices actually charged.
The ratios per square metre and per item on this page are stated in January 2026 values. They were updated from January 2025 values, the basis adopted for the whole cocoon, using the BT01 all-trades index published monthly by INSEE on its 2010 base: 132.0 in January 2025, 134.7 in January 2026, a rise of about 2 %.
The global amounts quoted as examples, and any rents, charges or receipts expressed per year or per night, remain on their own basis: a building cost index does not apply to them.
To bring the ratios forward, apply the usual revision formula: updated value = page value × (BT01 for the month in question / 134.7). The index has kept rising since: it stood at 139.4 in August 2026, the last value published when this page was checked (Journal officiel of 16 October 2026), that is 3.5 % above the reference base. BT01 measures contractors' input costs, wages and social charges, materials, plant and energy, not the prices actually tendered.