The environmental regulations: the construction premium priced item by item

📐 Focus

By , construction economist

Information verified on 10 min read

The environmental regulations came into force in 2022 with the promise of a transition to buildings that consume less energy and less carbon, but with an unavoidable construction premium. Three years into their application, the first feedback allows that premium to be quantified more precisely than the initial estimates. The answer is nuanced: the premium is real and measurable item by item, but it depends heavily on the constructional choices and on the level of performance sought.

The overall premium by building type

Studies published by the industry bodies, the national energy agency, the developers' federation and thermal engineers between 2022 and 2025 converge on the following ranges. They represent the construction premium excluding VAT against a building compliant with the previous thermal standard, at identical brief and standing.

Building type Premium against the previous standard Range by constructional choice
Individual house + 4 to 8 % + 3 % with an air-source heat pump and standard external insulation, to + 12 % with timber frame and ground-source
Apartment building + 3 to 7 % + 2 % with low-carbon concrete and a communal heat pump, to + 10 % with timber frame
Offices + 5 to 12 % + 4 % with concrete structure and a heat pump, to + 15 % for a positive-energy building
Education + 4 to 9 % Variable with site and brief
New hotel + 3 to 8 % According to star rating and energy systems

These are orders of magnitude. The real premium depends on the outline assumptions: climate zone, density, height, brief, site constraints.

A more recent assessment is available. An official review handed to the housing minister on 10 July 2025 puts the investment premium at about 11 % between 2022 and 2031: 2 % for insulation, 3 % for heating and hot water, 6 % for decarbonisation, of which 2 % at the 2025 step, about 28 € per m² of floor area. The decree of 18 March 2026, applicable to applications filed from 1 July 2026, then adjusted the requirements for roof extensions below 150 m² or below 30 % of the existing floor area and added modulating coefficients to the thresholds according to average ceiling height, the balcony, loggia and terrace area of apartment buildings and, for buildings connected to a classified district heating network, the presence of air conditioning. The decree of 15 January 2026 separately extended the regulations to thirteen categories of commercial and industrial buildings for applications filed from 1 May 2026, bringing programmes previously outside the scope into the premium calculation.

Where the premium comes from

1 The envelope: reinforced insulation

The regulations cap the bioclimatic indicator at 63 points for a house and 65 for an apartment building before modulation, an effort of about 30 % on the average under the previous standard (government review, July 2025). These thresholds bear on results (CCH, art. R172-4), supplemented by a few prescriptive requirements (order of 4 August 2021): designers choose their solutions, most often reinforced thermal insulation, 20 to 40 mm more on the opaque envelope, triple glazing in the coldest zone, and movable solar protection, external blinds or shutters, on exposed façades to limit summer overheating.

Envelope item Effect against the previous standard Indicative premium
Wall insulation 20 to 40 mm more thickness + 5 – 12 € excl. VAT per m² of floor area
Roof and ground floor insulation Thickness taken to 200–300 mm + 3 – 8 € excl. VAT per m² of floor area
Glazing Triple glazing often chosen in the coldest zone + 20 – 40 € excl. VAT per m² of glazing
Solar protection External blinds or brise-soleil, often chosen for summer comfort + 40 – 100 € excl. VAT per m² of south or west façade
Air permeability In housing, a capped value shown by a test (blower door) or by a quality procedure (order of 4 August 2021, art. 17 and 19) + 1,500 – 3,000 € excl. VAT per building

2 Energy systems: the end of gas

The effective prohibition of gas boilers in new buildings, through carbon and energy thresholds that penalise gas heavily, is the most structuring measure. It requires heat pumps, whether air-source, air-to-water or ground-source, solar thermal or biomass. That change is the most significant premium for individual houses. The decree of 12 September 2026 (CCH, art. R172-14) completes it with a rule per energy source: less than 79 g CO₂ eq./kWh for every energy source used for heating, cooling and hot water, district heating excepted, for housing applications filed from 1 January 2027, those of public-sector clients from 1 January 2028 and all other buildings from 1 January 2030.

System Cost under the previous standard, gas Cost under the current regulations, heat pump Premium
Heating a 90 m² house Gas boiler: 3,000 – 6,000 € Air-to-water heat pump: 8,000 – 15,000 € + 5,000 – 9,000 €
Heating an apartment, per dwelling Communal gas: 2,000 – 4,000 € Communal heat pump, pro rata: 4,000 – 8,000 € + 2,000 – 4,000 €
Domestic hot water in an apartment Gas water heater: 1,500 – 3,000 € Thermodynamic cylinder: 3,000 – 6,000 € + 1,500 – 3,000 €
Cooling offices Gas plant with chillers: 60 – 100 €/m² Reversible heat pump: 70 – 120 €/m² + 10 – 20 €/m²

3 Low-carbon materials and the life-cycle assessment

The construction carbon indicator requires the footprint of the materials to be limited. Standard reinforced concrete is penalised, since a high cement content means a high footprint. The alternatives, low-carbon concrete, timber frame, cross-laminated panels, bio-based insulation such as hemp, cellulose and straw, have a lower footprint but a purchase premium.

Material Typical construction carbon Premium against standard concrete
Standard reinforced concrete 250 – 350 kg CO₂ eq./m² The reference
Low-carbon concrete 120 – 180 kg CO₂ eq./m² + 3 – 8 % on the structural cost
Cross-laminated timber frame −50 to −150 kg CO₂ eq./m², through sequestration + 10 – 20 % on the structural cost
Glass or mineral wool insulation Low The insulation reference
Cellulose insulation Very low, negative where recycled + 15 – 30 % against mineral wool
Hemp insulation Very low + 20 – 40 % against mineral wool

4 Additional studies and certificates

The regulations create study and certificate obligations beyond the previous standard. These costs are often neglected in initial feasibility studies.

Additional mission Who carries it out Estimated cost excl. VAT
Dynamic life-cycle assessment Thermal engineer with approved software 2,000 – 8,000 € according to the size of the operation
Construction carbon calculation Thermal engineer Included in the thermal mission, plus 500–2,000 €
Air permeability test A certified operator 1,500 – 3,000 € per building
Compliance certificate with the application Design team or thermal engineer Fees included in the mission
Completion certificate Architect, assessor, technical controller or certifier 1,500 – 4,000 € according to the building
Complete thermal engineering mission An approved thermal engineer 0.5 – 1.5 % of the works cost excl. VAT

What the regulations save

If the regulations generate a capital premium, they must be assessed on their overall return. The energy savings over the life of the building can amply offset the initial premium.

Indicator Previous standard Current regulations Estimated annual saving
Consumption, individual house Below 50 kWh/m²·year Around 30 kWh/m²·year 200 – 400 € a year per dwelling
Consumption, apartment Below 57.5 kWh/m²·year Around 40 kWh/m²·year 150 – 300 € a year per dwelling
Consumption, offices Below 100 kWh/m²·year Around 60 kWh/m²·year 300 – 600 € a year per 100 m²
Emissions, gas-heated house Around 1.5 t CO₂ a year Around 0.2 t CO₂ a year −1.3 t CO₂ a year

Over 20 years, assuming energy prices rise 4 % a year, the discounted gain per apartment is of the order of 5,000 to 12,000 €, giving a payback of 7 to 15 years on the average premium.

Trade-offs that limit the premium

1 Optimise the envelope through bioclimatic design

A bioclimatic approach, optimal orientation, compactness, passive solar gain, summer shading, significantly reduces the bioclimatic indicator at no material cost. A well-oriented building can meet the requirement with standard insulation, saving 5 to 10 € excl. VAT per square metre on the envelope.

2 Low-carbon concrete against changing construction system

Low-carbon concrete is generally the cheapest way to improve the construction carbon indicator, at 3 to 8 % on the structural cost alone, against a complete switch to timber at 10 to 20 %. For standard apartment programmes, low-carbon concrete remains the economically optimal choice in most cases.

3 Communal against individual heat pumps

In apartment buildings, a communal air-to-water heat pump with a distribution network generally performs better on energy carbon than individual units per dwelling. The investment is larger but the operating cost is lower.

The economist's role

The construction economist occupies a strategic position in optimising compliance. Their role goes beyond pricing the items: they must weigh the technical solutions proposed by the thermal engineer and the design team by quantifying the premium of each option; verify that the specification requires the manufacturers' environmental declarations needed for the carbon calculation; anticipate the future carbon thresholds of 2025 and 2028 to avoid redesign; and value the operating savings in feasibility analyses for developers.

The figures in summary Overall premium against the previous standard: + 3 to 8 % for housing, + 5 to 12 % for commercial. Principal items: envelope (+ 3–12 €/m² of floor area), heat pump (+ 510–1,530 € per dwelling), life-cycle assessment and studies (+ 0.5–1.5 % of engineering fees). Low-carbon concrete is the optimal cost-to-carbon solution for ordinary housing. Thermal engineering: a fee budget of 0.5–1.5 % of the works cost, to build in from feasibility. Completion certificate: 1,500 – 4,000 € excl. VAT to allow for. Return over 20 years: 5,000 – 12,000 € of discounted energy savings per dwelling.

Links to the related articles

The environmental regulations article develops the indicators, thresholds and calculation method in full. The new apartment and new house articles apply that data to residential types. The residential block article covers the constraints specific to apartment buildings. The refurbishment article clarifies why the regulations do not apply to renovation.

Sources: the official guidance of May 2025; the decree of 29 July 2021; the order of 4 August 2021 as amended; the industry feedback reports of 2023–2024; the national energy agency's guide to bio-based materials; and the national environmental product database.

Reference basis of the figures

These bands are orders of magnitude for framing. Unless the page names another area, their reference market is standard provincial France, outside the major cities (regional cost factor 1.00). They serve to place a budget at the earliest stages and to compare building types with one another. They replace neither a tender exercise nor an estimate prepared on drawings, and they are not a record of prices actually charged.

The ratios per square metre and per item on this page are stated in January 2026 values. They were updated from January 2025 values, the basis adopted for the whole cocoon, using the BT01 all-trades index published monthly by INSEE on its 2010 base: 132.0 in January 2025, 134.7 in January 2026, a rise of about 2 %.

The global amounts quoted as examples, and any rents, charges or receipts expressed per year or per night, remain on their own basis: a building cost index does not apply to them.

To bring the ratios forward, apply the usual revision formula: updated value = page value × (BT01 for the month in question / 134.7). The index has kept rising since: it stood at 139.4 in August 2026, the last value published when this page was checked (Journal officiel of 16 October 2026), that is 3.5 % above the reference base. BT01 measures contractors' input costs, wages and social charges, materials, plant and energy, not the prices actually tendered.

← Construction regulations in France: the complete guide 2026