Definition and regulatory framework
An office building is defined by its exclusive or dominant use for administrative or commercial work, without public access, or with reception limited enough not to justify classification as a building open to the public. It falls under the labour code's fire safety provisions, the workplace order of 4 November 1993, and the labour code's accessibility rules. Above 50 m it moves into the high-rise regime.
ℹ Private office building or type W? Type W: the public has access, clients, users, unaccompanied visitors, so the public-building regulation and the safety commission apply. A private office building: access only for staff or accompanied visitors, so the labour code applies. A mixed building, a headquarters with a public reception area, has its public part under the public-building regulation, with compartmentation from the rest. Where there is doubt, the client should consult the municipality or the safety commission to clarify the classification.
Fire regulation for workplaces
1 Fire resistance and compartmentation
Commercial workplaces are subject to the labour code's fire provisions, which set requirements on fire resistance, escape routes, means of rescue and evacuation plans. Floors between levels are REI 60, or REI 120 in basements. Partitions separating high-risk rooms, large archives, data centres, cooking, are REI 60 with an EI 60 door.
| Element | Regulatory requirement | Notes |
|---|---|---|
| Floors between levels | REI 60, REI 120 in basements | Labour code |
| Walls to archives above 300 m² | REI 60 | Self-closing EI 60 door |
| Service risers | EI 60, with fire-stopped penetrations | Intumescent collars at penetrations |
| Stairs above two upper floors | Enclosed to EI 60 | Self-closing EI 30 door |
| Lift shaft | EI 60 | Landing door EI 30 |
| Server rooms and data centres | REI 120 | Gaseous suppression recommended |
2 Escape routes
The labour code requires two exits per level above 20 people. The minimum width of escape routes is two units of passage, 1.20 m, for 50 to 100 people, and three units for 100 to 200. An evacuation plan displayed in each office and an annual evacuation drill are mandatory. Automatic fire detection is recommended by insurers for floorplates above 300 m².
Acoustics and comfort in an office building
New office buildings are subject to the acoustic regulation for commercial buildings, the order of 25 April 2003. Minimum insulation between rooms is set by use: cellular offices against open plan, meeting rooms, staff catering.
| Interface | Insulation required | Notes |
|---|---|---|
| Cellular office to corridor | At least 38 dB | Acoustic EI 30 door rated at least 35 dB |
| Cellular office to cellular office | At least 43 dB | An acoustic stud partition |
| Meeting room to open plan | At least 48 dB | Reinforced partition plus suspended ceiling |
| Open plan to outside | At least 30 dB | According to the road noise level |
| Lift to office | At most 35 dB(A) | Anti-vibration mountings plus an insulated shaft |
Reverberation in open-plan space is governed by the international standard on open-plan office acoustics, through steady-state sound pressure and distraction distance. Good acoustic treatment of open plan has become a certification criterion and a strong commercial argument for landlords.
Accessibility in an office building
Accessibility obligations for a private office building flow from the labour code. They are less demanding than for buildings open to the public but require accessible workstations, sanitary accommodation, canteen and meeting rooms for disabled workers.
ℹ Accessibility under the labour code → At least one accessible workstation per activity carried on in the building. → Accessible sanitary accommodation: at least one accessible WC per level occupied by workers. → A lift is mandatory on multiple levels above 50 workstations on upper floors. → Accessible parking: at least 2 % of spaces, minimum one, reserved for disabled staff. → Where part of the building is open to the public, the labour code and the public-building regulation both apply to the parts concerned.
The environmental regulations for new offices
The environmental regulations apply to new offices whose planning application was filed after 1 July 2022. Thresholds are defined for office use. Unlike housing, the commercial regime does not oblige abandonment of gas, but the energy and carbon thresholds make retaining a gas boiler difficult without substantial renewable input.
ℹ Points of vigilance Glazing ratio: above 50 % of the façade the bioclimatic indicator degrades sharply, making external brise-soleil or selective glazing necessary. High internal gains, dense open plan, a data centre, create substantial cooling demand: free cooling and adiabatic cooling should be assessed. Construction carbon: a standard concrete structure is penalised, so low-carbon concrete or a mixed concrete and timber frame becomes necessary for the 2025 thresholds. The commercial energy decree: where the building is let to third-party occupiers above 1,000 m², tenants must reduce their consumption by 40 % by 2030, 50 % by 2040 and 60 % by 2050, to be reflected in the leases.
The economic impact for the construction economist
| Item | Indicative ratio | Notes |
|---|---|---|
| Structure, concrete or mixed concrete and timber | 410 – 710 €/m² of floor area | Low-carbon concrete adds 5 to 10 % |
| Façade, cladding or curtain walling | 260 – 710 €/m² of façade | Aluminium and glass curtain walling is expensive |
| Heating, cooling and ventilation | 100 – 260 €/m² of floor area | Variable refrigerant flow or heat-recovery air handling |
| Power and LED lighting | 60 – 120 €/m² of floor area | Building management is required for compliance |
| Data cabling | 40 – 90 €/m² of floor area | Enterprise grade plus network infrastructure |
| Open-plan acoustics | 15 – 40 €/m² of floor area | Absorbent ceilings plus acoustic glazed partitions |
| Accessibility: workstations and sanitary | 3 – 8 €/m² of floor area | According to the proportion of accessible positions |
| Lifts | 30,000 – 80,000 € per car | According to speed and finishes |
| Premium of the environmental regulations | 5 – 12 % | Façade, services, controls, materials |
ℹ ✔ Summary for the economist Construction cost of a standard office, excluding land, external works and tenant fit-out: 1,530 – 2,550 €/m² of floor area. A premium office with double-skin curtain walling, high certification and smart building systems: 2,550 – 4,080 €/m². Basement parking: 20,500 – 41,000 € per space, covering excavation, structure, lighting and smoke control. On the commercial energy decree, inform the landlord client of the performance obligations falling on future tenants. Certification adds 3 to 8 % on construction plus certification fees of 30,000 to 100,000 €.
Links to the other articles in this cocoon
The public-building article covers type W offices open to the public. Fire safety and fire resistance are developed in the fire article. The environmental regulations, across all building types, have their own article. For office towers above 50 m, see the high-rise article. The mixed-use article covers buildings combining offices and housing.
Reference basis of the figures
These bands are orders of magnitude for framing. Unless the page names another area, their reference market is standard provincial France, outside the major cities (regional cost factor 1.00). They serve to place a budget at the earliest stages and to compare building types with one another. They replace neither a tender exercise nor an estimate prepared on drawings, and they are not a record of prices actually charged.
The ratios per square metre and per item on this page are stated in January 2026 values. They were updated from January 2025 values, the basis adopted for the whole cocoon, using the BT01 all-trades index published monthly by INSEE on its 2010 base: 132.0 in January 2025, 134.7 in January 2026, a rise of about 2 %.
The global amounts quoted as examples, and any rents, charges or receipts expressed per year or per night, remain on their own basis: a building cost index does not apply to them.
To bring the ratios forward, apply the usual revision formula: updated value = page value × (BT01 for the month in question / 134.7). The index has kept rising since: it stood at 138.3 in June 2026, the last value published when this page was checked, that is 2.7 % above the reference base. BT01 measures contractors' input costs, wages and social charges, materials, plant and energy, not the prices actually tendered.
Articles liés
Sources: the labour code, the workplace order of 4 November 1993, the acoustic order of 25 April 2003, the environmental regulations decree of 29 July 2021 and the commercial energy decree of 2019.