The facade of the example
The example in the guide to reducing construction costs has a perimeter of 114 m and a facade height of 15 m, that is about 1,710 m², of which about 430 m² are openings and about 1,280 m² are solid wall. With the 540 m² roof, facades and roofs account for between 12 and 18 % of the PEM (presupuesto de ejecución material, the bare construction cost) of an apartment building according to the guide to construction cost per m², between about €420,000 and €625,000 for the example.
A price per square metre of facade can only be compared at an identical scope. It is worth knowing whether it includes the backing leaf that supports the system, the insulation, the internal lining, the scaffolding, the trims and the proportional share of the openings. Two apparently contradictory prices may describe different scopes, as happens with ratios per square metre of floor area.
The systems compared
The table summarises what each system requires and what the blog allows us to put a figure on. The prices refer to the system, not to the complete facade:
| System | What it requires from the rest of the building | Price published on the blog |
|---|---|---|
| Facing brick with cavity and insulation | Outer leaf supported floor by floor, treatment of slab edges and lintels | Not published |
| SATE (external thermal insulation with render or cladding) | Continuous substrate, fixings, reinforcement at ground floor and careful junctions with window frames | €55 to €95/m² of facade with standard 6 cm EPS; €90 to €150/m² for high-performance solutions |
| Ventilated facade | Backing leaf, anchored subframe, insulation and cladding panels | Not published |
| Curtain wall | Facade hung from the floor slabs, continuous framing, joints with the slabs | Not published |
The SATE prices come from the blog page on the cost of energy renovation and refer to the system applied to an existing facade, per square metre of treated facade. In new construction they are added to the cost of the backing leaf, which the SATE does not replace. Applied to the 1,280 m² of solid wall in the example, the standard EPS system represents between about €70,000 and €122,000, and the high-performance one between about €115,000 and €192,000, in both cases without the backing leaf.
For the other systems, the blog does not publish a price per square metre of facade, and this article does not invent one. What can be said without a figure is the direction of the steps: the ventilated facade adds a subframe and a cladding to the backing leaf, whose cost depends above all on the panel chosen, and curtain walls, together with facades with high acoustic and thermal performance, account for much of the extra cost of high-end office buildings, as the blog page on office construction cost per m² points out.
What weighs as much as the system
The proportion of openings
Openings cost more per square metre than the solid part of almost any ordinary system, and they also determine the energy demand. On the example, moving from 25 % to 30 % openings turns about 85 m² of solid facade into frames and glazing. The effect depends on the system: it is greater on a cheap facade, where the opening is the most expensive element, than on a curtain wall, where everything is framing.
The junctions
A facade is not paid for by its plain surface alone. Corners, setbacks, slab edges, lintels, sills and roof trims have a cost per linear metre that the price per square metre does not capture. That is why the setbacks discussed in building compactness cost more than their square metres: each one adds two corners and their junctions.
The CTE requirements
The facade system meets several requirements of the CTE (Código Técnico de la Edificación, the Spanish building code) at once. Protection against moisture is covered on the page about DB HS 1, control of energy demand in DB HE 1 and external fire spread in DB SI 2, which requires facade systems and insulation placed in ventilated cavities to achieve a reaction to fire class depending on the height of the facade. A cheaper system that forces a change of insulation to meet that class may lose its advantage.
What is kept of the appearance when changing system
Changing system does not mean changing appearance. A design conceived in facing brick can keep the brick on the ground floor and on the most visible sections and switch to a lighter system elsewhere; a ventilated facade can be limited to the main elevations. These combinations are decided at preliminary design stage, with their junctions drawn, because every change of system creates a new junction.
The practical rule is to compare by facade, not by system: solid area, area of openings, linear metres of junctions and the system for each section. That take-off can be done with the first massing, long before the construction design.
In summary
On the example, facades and roofs account for between about €420,000 and €625,000 of PEM according to the blog, and the facade has about 1,280 m² of solid wall and 430 m² of openings. The blog publishes a price for SATE, €55 to €95/m² with standard EPS, but not for facing brick, ventilated facades or curtain walls. The proportion of openings, the junctions and the CTE requirements weigh as much as the system, and all of them can be measured from the preliminary design onwards.
Nature of the values cited
Regulatory requirements are cited with their basic document. The areas come from the example project, calculated on fictitious assumptions, and the prices are given as examples, taken from the pages of this blog: they do not replace a consultation with contractors or a priced bill of quantities.
Sources: Prices given as examples, established in November 2026 from public references: chapter weightings from this blog's guide to construction cost per m² and SATE prices from its page on energy renovation, 2026 · Código Técnico de la Edificación, DB SI, section SI 2; DB HS, section HS 1; DB HE, section HE 1.