The construction cost is not the cost of the building
The construction cost is paid once; running costs are paid every year for decades. A decision that saves a few thousand euros on site and costs a few hundred a year in energy or maintenance can become the most expensive in the project. The blog says so for the detached house: the saving that is paid twice lives in the envelope and the building services, as the page on the cost of building a detached house points out.
On the apartment building of the guide to reducing construction costs, the running cost items are read per unit and per building. Each flat pays for its own energy; the owners' association pays for the lift, cleaning, lighting and maintenance of the common parts, car park included, and sets money aside for replacements.
Seven common false economies
| Saving on site | What it costs later | Who pays |
|---|---|---|
| Insulation at the legal minimum | More energy for heating and cooling | Every occupant, every year |
| Low-end windows | Heat loss, condensation, early replacement | Occupants, then owners |
| Services without controls or separate metering | Uncontrolled consumption, disputes between owners | Owners' association |
| Lift and components at the lowest specification | Breakdowns, frequent call-outs, a more costly maintenance contract | Owners' association |
| Fragile cladding on the lower floors | Repeated repairs of impacts and graffiti | Owners' association |
| Cheap basement waterproofing | Leaks into the garages, repairs with the basement in use | Owners' association, often in litigation |
| Undersized plant rooms | Difficult maintenance, longer and more expensive replacements | Owners' association |
None of these items is a mistake in itself. It becomes a false economy when the cost it shifts over time exceeds the initial saving, or when it shifts that cost onto someone who took no part in the decision.
Envelope and building services
Envelope and building services together account, according to the construction cost breakdown, for between 35 and 45 per cent of the cost of a residential building. They are also the items that decide consumption. A quote with building services below the range generally describes a building with minimum performance, not a bargain, and whoever buys it pays the difference in their bills.
The basement
Basement waterproofing is the typical case of an irreversible saving. Redoing it with the garages in use costs far more than doing it properly during construction, and often requires excavation or work from the inside of limited effectiveness. The subject connects to the groundwater investigations covered on the page on foundations and the geotechnical report.
Who pays what: selling or keeping
The developer who sells on completion does not pay the running costs, and the temptation to shift costs into the future is structural. But running costs come back by other routes: in defects disputed at handover, in the developer's reputation, in the sale value when buyers compare energy ratings. Acoustics between flats, which the blog identifies as the most disputed defect in multi-family housing, is the clearest example: the saving is made on site and paid for in disputes.
Those who build to keep, whether to let or for their own use, do the opposite sum. For them the relevant cost is the total of construction, energy, maintenance and replacements over a given period. Two clients with the same project can therefore legitimately choose differently, provided they say so at the outset.
How to bring running costs into design decisions
The method is the same as on the other pages of this guide: one assumption at a time, with its quantities. For each alternative, write down the construction cost, the expected consumption or intervention, the frequency of replacements and who pays for them. No sophisticated model is needed: it is enough that the comparison is made on the same items and over the same period.
Three questions guide the comparison. Which components will need replacing during the period considered? Which consumption changes with the decision? Who will bear these costs, and have they accepted the decision? The answers are written next to the construction cost in the note that closes the feasibility stage.
In summary
A site saving that is paid back in energy, maintenance or replacements is not a saving for whoever runs the building. On the example apartment building, the most common false economies concern the envelope, windows, building services, lift, basement waterproofing and plant rooms. Those who sell and those who keep do not do the same sum, and the choice should be stated at the outset.
Nature of the values quoted
The cost shares are those of the blog. Running cost items are described without amounts because they depend on the building, the contracts and the use: they do not replace a maintenance plan or an energy audit.
Sources: cost shares from the pages of this blog on the construction cost breakdown, on detached houses and on apartment buildings, 2026.